Locomotive Scheduling in Freight Transport at Mpopoma Train Station in Bulawayo for the Southern Region, Zimbabwe
نویسنده
چکیده
In this paper the results of a locomotive scheduling problem faced by National Railways of Zimbabwe (NRZ) are presented. The study is in part inspired by similar optimization problems in public transports. This paper focuses on the planning version of the locomotive scheduling model (LSM), where there are multiple types of locomotives and a decision is made as to which set of locomotives is to be assigned to each train. The goal is to develop excellent plans along a number of dimensions for NRZ. An integrated model (Model 1) that determines the set of active and deadheaded locomotives for each train, and light travelling locomotives is presented. An important feature of this model is that consist-bustings are explicitly considered. Two other models namely Model 2 and Model 3 are also considered in this paper. A mixed integer programming (MIP) formulation of the problem that contains 20 integer variables and 32 constraints is given (Model 1). Using LINGO 10, a solution technique was developed to solve this problem within 2 minutes of computation time. When the solution was compared with the existing scenario at NRZ, savings of 38 locomotives were realised, which translates into savings of over ten million dollars annually.
منابع مشابه
Concurrent Locomotive Assignment and Freight Train Scheduling
The locomotive assignment and the freight train scheduling are important problems in railway transportation. Freight cars are coupled to form a freight rake. The freight rake becomes a train when a locomotive is coupled to it. The locomotive assignment problem assigns locomotives to a set of freight rakes in a way that, with minimum locomotive deadheading time, rake coupling delay and locomotiv...
متن کاملFreight Locomotive Rescheduling and Uncovered Train Detection during Disruptions
This paper discusses optimization of freight train locomotive rescheduling under a disrupted situation in the daily operations in Japan. In the light of the current framework of dispatching processes that passenger railway operators modify the entire timetables, the adjusted timetable is distributed to a freight train operator. We solve the locomotive rescheduling problem for the given adjusted...
متن کاملA decomposition based hybrid heuristic algorithm for the joint passenger and freight train scheduling problem
We study the joint problem of scheduling passenger and freight trains for complex railway networks, where the objective is to minimize the tardiness of passenger trains at station stops and the delay of freight trains. We model the problem as a mixed integer program and propose a twostep decomposition heuristic to solve the problem. The heuristic first vertically decomposes the train schedules ...
متن کاملEffectiveness of Removal in Transit System in Zimbabwe – A Case of Beitbridge and Forbes Border Posts
The paper set out to investigate the effectiveness of the removals in transit (RIT) system in facilitating trade. The study wanted to establish whether the Removals in Transit system currently being used in Zimbabwe is effective enough, that is whether acquittals of entries are being done in the system properly or fraudulently. A sample size of 200 Zimbabwe Revenue Authority (ZIMRA) employees a...
متن کاملLocomotive assignment problem with train precedence using genetic algorithm
This paper aims to study the locomotive assignment problem which is very important for railway companies, in view of high cost of operating locomotives. This problem is to determine the minimum cost assignment of homogeneous locomotives located in some central depots to a set of pre-scheduled trains in order to provide sufficient power to pull the trains from their origins to their destinations...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2012