A Cpm-based Bidirectional Approach for Type-i Assembly Line Balancing Problem

نویسنده

  • Hsiu-Hsueh Kao
چکیده

In this paper we consider the so-called type-I assembly line balancing problem (ALBP-I), in which the objective is to minimize the number of workstations needed for a given cycle time. ALBP-I is one of the well-known NP-hard problems in operations management, and many optimal approaches (including 0-1 integer programming model, branch and bound algorithm, dynamic programming model, etc.) have been developed during the past decades. However, all optimal approaches share the disadvantage of being computationally inefficient in solving large-scale problems, and which makes heuristics a necessity in practice. We propose in this paper a new approach, based on the recently proposed bidirectional heuristic and the critical path method (CPM) of project management, to resolve the issue of task assignment for ALBP-I. A numerical example is given for illustration, and several sample problems are solved to show the effectiveness of the proposed approach.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A new heuristic method based on CPM in SALBP

The task of balancing of assembly lines is well-known in mass production system but this problem is NP-hard even for the simple straight line. Therefore, utilizing heuristic methods for these problems is totally unquestionable. Furthermore, in line with balancing problems, heuristic methods are the foundation of the metaheuristic methods, thus it seems to be necessary to use more efficient heur...

متن کامل

A cost-oriented model for multi-manned assembly line balancing problem

In many real world assembly line systems which the work-piece is of large size more than one worker work on the same work-piece in each station. This type of assembly line is called multi-manned assembly line (MAL). In the classical multi-manned assembly line balancing problem (MALBP) the objective is to minimize the manpower needed to manufacture one product unit. Apart from the manpower, othe...

متن کامل

A Bi-Objective Approach to an Assembly Line Re-Balancing Problem: Model and Differential Evolution Algorithms

Assembly lines are special kinds of production systems which are of great importance in the industrial production of high quantity commodities. In many practical manufacturing systems, configuration of assembly lines is fixed and designing a new line may be incurred huge amount of costs and thereby it is not desirable for practitioners. When some changes related to market demand occur, it is wo...

متن کامل

Fuzzy multi-objective assembly line balancing problem: Fuzzy mathematical programming approach

Design of assembly line is done in order to more coordinate a collection of some consecutive work stations for the aim of obtaining more productivity from the work stations and workers. The stations are arranged in a way to have a continuous and constant material flow. In this paper a multi-objective formulation for assembly line balancing is introduced. As a solution approach a two-step approa...

متن کامل

A multi-objective genetic algorithm for a mixed-model assembly U-line balancing type-I problem considering human-related issues, training, and learning

Mixed-model assembly lines are increasingly accepted in many industrial environments to meet the growing trend of greater product variability, diversification of customer demands, and shorter life cycles. In this research, a new mathematical model is presented considering balancing a mixed-model U-line and human-related issues, simultaneously. The objective function consists of two separate com...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008