Unreliable and resource-constrained decoding

نویسنده

  • Lav R. Varshney
چکیده

Traditional information theory and communication theory assume that decoders are noiseless and operate without transient or permanent faults. Decoders are also traditionally assumed to be unconstrained in physical resources like materiel, memory, and energy. This thesis studies how constraining reliability and resources in the decoder limits the performance of communication systems. Five communication problems are investigated. Broadly speaking these are communication using decoders that are wiring cost-limited, that are memory-limited, that are noisy, that fail catastrophically, and that simultaneously harvest information and energy. For each of these problems, fundamental trade-offs between communication system performance and reliability or resource consumption are established. For decoding repetition codes using consensus decoding circuits, the optimal tradeoff between decoding speed and quadratic wiring cost is defined and established. Designing optimal circuits is shown to be NP-complete, but is carried out for small circuit size. The natural relaxation to the integer circuit design problem is shown to be a reverse convex program. Random circuit topologies are also investigated. Uncoded transmission is investigated when a population of heterogeneous sources must be categorized due to decoder memory constraints. Quantizers that are optimal for mean Bayes risk error, a novel fidelity criterion, are designed. Human decision making in segregated populations is also studied with this framework. The ratio between the costs of false alarms and missed detections is also shown to fundamentally affect the essential nature of discrimination. The effect of noise on iterative message-passing decoders for low-density paritycheck (LDPC) codes is studied. Concentration of decoding performance around its average is shown to hold. Density evolution equations for noisy decoders are derived. Decoding thresholds degrade smoothly as decoder noise increases, and in certain cases, arbitrarily small final error probability is achievable despite decoder noisiness. Precise information storage capacity results for reliable memory systems constructed from unreliable components are also provided. Limits to communicating over systems that fail at random times are established. Communication with arbitrarily small probability of error is not possible, but schemes that optimize transmission volume communicated at fixed maximum message error probabilities are determined. System state feedback is shown not to improve performance.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Efficient Genetic Agorithm for Solving the Multi-Mode Resource-Constrained Project Scheduling Problem Based on Random Key Representation

In this paper, a new genetic algorithm (GA) is presented for solving the multi-mode resource-constrained project scheduling problem (MRCPSP) with minimization of project makespan as the objective subject to resource and precedence constraints. A random key and the related mode list (ML) representation scheme are used as encoding schemes and the multi-mode serial schedule generation scheme (MSSG...

متن کامل

The preemptive resource-constrained project scheduling problem subject to due dates and preemption penalties: An integer programming approach

Extensive research has been devoted to resource constrained project scheduling problem. However, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. In this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...

متن کامل

Uncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem

Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...

متن کامل

A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm

In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...

متن کامل

Optimization and Simulation of Resource Constrained Scheduling Problem Using Genetic Algorithm

Due to the development of management idea and the scarcity of some resources, the lean management has become the necessary request to implement effective control of resource constrained project. Resource constrained project scheduling is the significant guarantee to attain the lean management. The resource constrained project scheduling problem (RCPSP), with the objective of minimizing project ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010