Some results on scheduling tasks with self-suspensions

نویسندگان

  • Frédéric Ridouard
  • Pascal Richard
  • Francis Cottet
  • Karim Traore
چکیده

In most real-time systems, tasks use remote operations that are executed upon dedicated processors. External operations introduce self-suspension delays in the behavior of tasks. This paper presents several negative results concerning scheduling independent hard real-time tasks with self-suspensions. Our main objective is to show that well-known scheduling policies such as fixed-priority or Earliest Deadline First are not efficient to schedule such task systems. We prove the scheduling problem to be NP-hard in the strong sense, even for synchronous task systems with implicit deadlines. We also show that scheduling anomalies can occur at run-time: reducing the execution requirement or the suspension delay of a 1 task can lead the task system to be infeasible under EDF. Lastly, we present negative results on the worst-case performances of well-known scheduling algorithms (EDF, RM, DM, LLF, SRPTF) to maximize tasks completed by their deadlines and to minimize the maximum response time of tasks.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Multiprocessor Schedulability Analysis for Self - Suspending Task Systems ∗

In many real-time systems, tasks may experience suspension delays. The problem of analyzing task systems with such suspensions on multiprocessors has been relatively unexplored and is thought to be difficult (as it is on uniprocessors). In this paper, hard/soft multiprocessor schedulability tests for arbitrary-deadline sporadic self-suspending task systems are presented for both global EDF and ...

متن کامل

Errata for three papers (2004-05) on fixed-priority scheduling with self-suspensions

The purpose of this article is to (i) highlight the flaws in three previously published works [3][2][7] on the worst-case response time analysis for tasks with self-suspensions and (ii) provide straightforward fixes for those flaws, hence rendering the analysis safe. 2012 ACM Subject Classification MANDATORY: Please refer to www.acm.org/about/class/2012

متن کامل

Suspension-Aware Schedulability Analysis for Multiprocessor Embedded Systems

In many embedded systems, tasks may experience suspension delays. The problem of analyzing task systems with such suspensions on multiprocessors has been relatively unexplored. The commonly used suspension-oblivious approach of treating all suspensions as computation can be quite pessimistic. As an alternative, this paper presents the first suspension-aware multiprocessor schedulability analysi...

متن کامل

Schedulability Analysis of Task Sets with Upper- and Lower-Bound Temporal Constraints

Increasingly real-time systems must handle the self-suspension of tasks, i.e. lowerbound wait times between subtasks, in a timely and predictable manner. A fast schedulability test that does not significantly overestimate the temporal resources needed to execute self-suspending task sets would be of benefit to these modern computing systems. In this paper, we present a polynomial-time test that...

متن کامل

Fuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flow Time through Genetic Algorithm

Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. One type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical model for...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • J. Embedded Computing

دوره 2  شماره 

صفحات  -

تاریخ انتشار 2006