Models and Algorithms for the Constrained Orienteering Problem
نویسندگان
چکیده
The constrained orienteering problem (COP) can be expressed as: Given an undirected weighted graph G = (V,E) and a subset S ⊆ V . Each node has a score, each edge has a weight indicating distance or time between the two adjacent nodes. The starting node and ending node are specified. Given a fixed amount of weight denoting the total distance or total time, the goal is to determine a walk from the starting node to the ending node through a subset of nodes including all the nodes in S, in order to maximize the total score of the walk. This problem is a generalization of the orienteering problem or a special case of the Steiner Tree problem. In this paper, we first formulate the COP problem into an integer linear programming based on network flow theory and solve it to obtain the exact optimal solution for examples of small size. Then we give a heuristic algorithm for solving the large instances of the problem. Finally, we give computational results of both exact and heuristic algorithms which demonstrate the efficient of the algorithm.
منابع مشابه
Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)
Resource constrained project scheduling problem (RCPSP) is mainly investigated with the objective of either minimizing project makespan or maximizing project net present value. However, when material planning plays a key role in a project, the existing models cannot help determining material ordering plans to minimize material costs. In this paper, the RCPSP incorporated with the material order...
متن کاملOrienteering Problem with Variable Profits, Fractional Objective Function and Demand on Arcs
Nowadays, due to the high expectations of customers in meeting their demand and the competition environment among service providers, employers are working to provide customers with new methods in the shortest possible time and in the best possible way to attract customer’s satisfaction and maximize profits. In this paper, the orienteering problem with variable profits, fractional objective func...
متن کاملA multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...
متن کاملA Cuckoo search algorithm (CSA) for Precedence Constrained Sequencing Problem (PCSP)
Precedence constrained sequencing problem (PCSP) is related to locate the optimal sequence with the shortest traveling time among all feasible sequences. In PCSP, precedence relations determine sequence of traveling between any two nodes. Various methods and algorithms for effectively solving the PCSP have been suggested. In this paper we propose a cuckoo search algorithm (CSA) for effectively ...
متن کاملOptimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms
The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2010