Establishing Key Performance Indicators to Measure the Benefit of Introducing the Facilities Manager at an Early Stage in the Building Information Modelling Process

نویسنده

  • Barry McAuley
چکیده

journal may be reproduced or used in any form or by any means without witten permission from the publisher, except for noncommercial, educational use including classroom teaching purposes. Product or company names used in this journal are for identification purposes only. Inclusion of the names of the products or companies does not indicate a claim of ownership by IGI Global of the trademark or registered trademark. The views expressed in this journal are those of the authors but not neccessarily of IGI Global. ABSTRACT The Facilities Manager occupies a unique position within the lifecycle of a building asset, as he/she is one of the only Architecture/Engineering/Construction (AEC) and Facilities Management (FM) professionals who is in a position to view the product of the entire design and build process and is responsible for the operational phase which incurs approximately five times the initial capital cost. Despite the potential benefits that the Facilities Manager offers, this profession still does not command the recognition it deserves within the AEC/ FM sector. This is beginning to change through the introduction of Building Information Modelling (BIM). In order for the BIM process to be maximised it is imperative that the Facilities Manager plays a much more important role within the design and construction process. Despite this, at present the role of the Facilities Manager within this process is still uncertain with no set Key Performance Indicators (KPI) or role designation being specified to date. This paper outlines how the Facilities Manager can play a pivotal role in the BIM process and, in particular, will aim to establish the basis for a number of KPIs by Facility Managers which will in turn lead to a more robust Lean FM practice.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Establishing Key Performance Indicators to Measure the Benefit of Introducing the Facilities Manager at an Early Stage in the Building Information Modeling Process

The Facilities Manager occupies a unique position within the lifecycle of a building asset, as he/she is one of the only Architecture/Engineering/Construction (AEC) and Facilities Management (FM) professionals who is in a position to view the product of the entire design and build process and is responsible for the operational phase which incurs approximately five times the initial capital cost...

متن کامل

Early Health Economic Modelling – Optimizing Development for Medical Device Developers?; Comment on “Problems and Promises of Health Technologies: The Role of Early Health Economic Modeling”

This commentary considers the positive and negative consequences of early economic modelling and explores potential future directions. Early economic modelling offers device manufacturers an opportunity to assess the potential value of an innovation at an early stage of development. Early modelling can direct resources into potentially viable technologies and reduce inv...

متن کامل

شناسایی شاخص‌های کلیدی عملکرد سیستم اطلاعات بیمارستان برای بهینه کاوی؛ یک مطالعه کیفی

Background: To have an optimal hospital information system, performance indicators used for evaluation must be recognized. Since defining proper performance indicators is one of the important principles in benchmarking. This study aimed to identify key indicators of hospital information system performance benchmarking. Methods: This qualitative content analysis study was conducted in 2016-2017...

متن کامل

Model of the Selection KPI for assessing the performance of the Urban HSE management system

Abstract: Background and aims: Performance assessment and also performance indicators have a great importance in all aspects of life. By these indicators appropriate responses to what is happening for make some improvement, could be determined. In the past, the safety and health performance of organizations was measured with using of some indicators from the USA Occupational Health and Safet...

متن کامل

Key performance indicators of emergency department: A literature review

Abstract Aim. The purpose of this study was to investigate the key performance indicators in the emergency department. Background. Health care organizations are confronted with various phenomena such as the rapid promotion of technology, changing demographic factors and changing lifestyles. On the other hand, the health care system has become one of the largest and most expensive industries in ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014