A Multi-Heuristic GA for Schedule Repair in Precast Plant Production

نویسندگان

  • Weng Tat Chan
  • Tan Heng Wee
چکیده

A multi-heuristic schedule repair model for schedule conflict resolution is presented and its application in repairing the schedules of a prefabrication plant is described in this paper. The model combines heuristic strategies with Genetic Algorithms to repair schedules with resource constraints. The GA determines the “best” sequence of resolving schedule disturbances using heuristic rules selected from a library of heuristics commonly used in industry. We compare quantitatively the advantages of using this model for schedule repair against existing singleheuristic schedule repair techniques with a multi-criteria evaluation function. Results on the macroscopic and microscopic levels are presented to understand the strengths and weaknesses of the model.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Meta-heuristic Algorithms for an Integrated Production-Distribution Planning Problem in a Multi-Objective Supply Chain

In today's globalization, an effective integration of production and distribution plans into a unified framework is crucial for attaining competitive advantage. This paper addresses an integrated multi-product and multi-time period production/distribution planning problem for a two-echelon supply chain subject to the real-world variables and constraints. It is assumed that all transportations a...

متن کامل

Designing an integrated production/distribution and inventory planning model of fixed-life perishable products

This paper aims to investigate the integrated production/distribution and inventory planning for perishable products with fixed life time in the constant condition of storage throughout a two-echelon supply chain by integrating producers and distributors. This problem arises from real environment in which multi-plant with multi-function lines produce multi-perishable products with fixed life ti...

متن کامل

A cost-oriented model for multi-manned assembly line balancing problem

In many real world assembly line systems which the work-piece is of large size more than one worker work on the same work-piece in each station. This type of assembly line is called multi-manned assembly line (MAL). In the classical multi-manned assembly line balancing problem (MALBP) the objective is to minimize the manpower needed to manufacture one product unit. Apart from the manpower, othe...

متن کامل

A multi-objective integrated production-allocation and distribution planning problem of a multi-echelon supply chain network: two parameter-tuned meta-heuristic algorithms

Supply chain management (SCM) is a subject that has found so much attention among different commercial and industrial organizations due to competing environment of products. Therefore, integration of constituent element of this chain is a great deal. This paper proposes a multi objective production-allocation and distribution planning problem (PADPP) in a multi echelon supply chain network. We ...

متن کامل

GA-Based Precast Production Planning System

Appropriate production plans can make resources utilized effectively as well as minimize waste. However, currently most of the precast fabricators propose production plans depending on the rule of thumb, resulting in the squander of resources and postponed delivery. Computerized scheduling techniques provide more precise outcomes than those made manually. The goal of this study is to develop a ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2003