Latest starting times and floats of activities in network with uncertain durations

نویسنده

  • Pawel Zielinski
چکیده

The computation of latest starting times and floats of activities in networks with uncertain durations, represented by means of interval and fuzzy numbers, is investigated.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Computational methods for determining the latest starting times and floats of tasks in interval-valued activity networks

In project management, three quantities are often used by project managers: the earliest starting date, the latest starting date and the float of tasks. These quantities are computed by the Program Evaluation and Review Techniques/Critical Path Method (PERT/CPM) algorithm. When task durations are ill known, as is often the case at the beginning of a project, they can be modeled by means of inte...

متن کامل

Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge

An overview of some fuzzy set-based approaches to scheduling is proposed, emphasizing two distinct uses of fuzzy sets: representing preference profiles and modelling uncertainty distributions. The first setting leads to a valued, noncompensatory generalization of constraint-directed scheduling. The other setting yields a possibility-theoretic counterpart of PERT, where probability distributions...

متن کامل

Solving Fuzzy PERT Using Gradual Real Numbers

From a set of a partially ordered tasks, one goal of the project scheduling problem is to compute earliest starting dates, latest starting dates and floats of the different tasks, and to identify critical tasks. When durations of tasks are not precisely known, the problem is much trickier. Recently we provided polynomial algorithms to compute upper bound of activity floats in the interval-value...

متن کامل

On the Latest Times and Float Times of Activities in a Fuzzy Project Network with LR Fuzzy Numbers

In this paper, the authors propose a new method to compute the fuzzy latest times and float times of activities for a project scheduling problem with fuzzy activity times. The authors have considered LR fuzzy numbers to represent the activity times. As the data of the problem are LR fuzzy numbers, the authors have shown that the results are also in terms of LR fuzzy numbers. Total float time of...

متن کامل

ROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS II. SOUNDS OF SILENCE: A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA HARMONY SEARCH METAHEURISTIC

In this paper, we present a new idea for robust project scheduling combined with a cost-oriented uncertainty investigation. The result of the new approach is a makespan minimal robust proactive schedule, which is immune against the uncertainties in the activity durations and which can be evaluated from a cost-oriented point of view on the set of the uncertain-but-bounded duration and cost param...

متن کامل