Control in Internal and Outsourced Software Projects

نویسندگان

  • Amrit Tiwana
  • Mark Keil
چکیده

Although the choice of control mechanisms in systems development projects has been extensively studied in prior research, differences in such choices across internal and outsourced projects and their effects of systems development performance have not received much attention. this study attempts to address this gap using data on 57 outsourced and 79 internal projects in 136 organizations. Our results reveal a paradoxical overarching pattern: controllers attempt greater use of control mechanisms in outsourced projects relative to internal projects, yet controls enhance systems development performance in internal projects but not in outsourced projects. We introduce a distinction between attempted control and realized control to explain this disconnect, and show how anticipated transaction hazards motivate the former but meeting specific informational and social prerequisites facilitate the latter. Our results contribute three new insights to the systems development control literature. First, controllers attempt to use controller-driven control mechanisms to a greater degree in outsourced projects but controllee-driven control mechanisms to a greater degree in internal projects. Second, we establish a hitherto-missing control– performance link. the nuanced differences in internal and outsourced projects simultaneously confirm and refute a pervasive assertion in the information systems controls literature that control enhances performance. Finally, we show how require01 tiwana.indd 9 11/13/2009 9:51:47 AM

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Metrics-based control in outsourced software development projects

Measurements have been recognized as vital instruments to improve control in outsourced software development projects. However, project managers are still struggling with the design and implementation of effective measurement programs. One reason for this is that although there is a large body of research literature on metrics, practical guidelines for choosing among concrete measurements are s...

متن کامل

Boundary Objects and Internal Control in Outsourced ISD Projects: Results of a Pilot Study

Control of outsourced IT projects is an important topic in several research disciplines. This study brings together two approaches from auditing and IS literature in order to obtain deeper understanding of control mechanisms in complex outsourced IT projects. It is proposed that communication tools, viewed as “boundary objects”, are also useful for implementing control functions, such as risk a...

متن کامل

Risks and Hidden Costs: A Study of 26 Outsourced Projects

Despite the current unfavorable outlook of the larger economy, there has been a steady increase in information systems outsourcing by organizations which is projected to reach $97.9 billion in 2012. Ordinarily, organizations outsource their software projects to avoid the risks associated with developing the software internally and to control costs. However, a study of twenty six outsourced proj...

متن کامل

Managing Outsourced Software Projects: An Analysis of Project Performance and Customer Satisfaction

We examine the drivers of project performance and customer satisfaction in outsourced software projects using a proprietary panel dataset. The data cover 822 customer observations related to 182 unique projects executed by an India-based software services vendor. Adopting a multidisciplinary perspective, we investigate how project planning, team stability, and communication effectiveness (antec...

متن کامل

A Framework to Improve the Requirements Engineering Process for Software Development Outsourcing

The number of IT projects outsourced for software development is increasing day by day as outsourcing is anticipated to provide substantial benefits and the organizations which outsource the projects have certain constraints. But unfortunately, a considerable number of the projects which are outsourced for development are failed in realizing the estimated results. The failure reasons are often ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • J. of Management Information Systems

دوره 26  شماره 

صفحات  -

تاریخ انتشار 2010