A Market-Utility Approach to Scheduling Employees

نویسندگان

  • John C. Goodale
  • Rohit Verma
  • Madeleine E. Pullman
  • MADELEINE E. PULLMAN
چکیده

Excerpt] Scheduling front-line service providers is a constant challenge for hospitality managers, given the inevitable tradeoff between service standards and operating expense. Traditional employee scheduling typically applies a cost-minimization approach to specify the level of front-line service providers who will be available to meet periodic demand. That cost includes the opportunity cost of lost customers, which is part of the pseudo-costs of understaffing. A confounding and often ignored effect, however, is the benefit generated by maintaining high service levels in a system where capacity exceeds demand. That is, scheduling more frontline service providers than the minimum level necessary to provide acceptable customer service (what might be considered to be overstaffing in some rubrics) may mean that customers receive service that is better than they expected (or what company standards prescribe). In this paper we report on a scheduling approach that explicitly considers the interrelationships among customer preferences, customer demand, waiting times, and scheduling decisions. This approach, which we call the "market-utility model for scheduling" (MUMS), helps managers consider the dynamics of scheduling service employees. First, we discuss the components that make up this approach, which includes methods from customer-preferences modeling, service-capacity planning, and the four tasks of labor scheduling proposed by Thompson. Next, we'll show how the model applies to balancing queue lengths and operating costs for an airport food-court vendor. Finally, we discuss the value of MUMS for hospitality managers.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Solving a bi-objective manpower scheduling problem considering the utility of objective functions

This paper presents a novel bi-objective manpower scheduling problem that minimizes the penalty resulted from employees’ assignment at lower skill levels than their real skill and maximizes employees’ utility for working at a special skill level in some shifts or on some days. Employees are classified in two specialist groups and three skill levels in each specialization. In addition, the prese...

متن کامل

Energy Scheduling in Power Market under Stochastic Dependence Structure

Since the emergence of power market, the target of power generating utilities has mainly switched from cost minimization to revenue maximization. They dispatch their power energy generation units in the uncertain environment of power market. As a result, multi-stage stochastic programming has been applied widely by many power generating agents as a suitable tool for dealing with self-scheduling...

متن کامل

Multi Objective Scheduling of Utility-scale Energy Storages and Demand Response Programs Portfolio for Grid Integration of Wind Power

Increasing the penetration of variable wind generation in power systems has created some new challenges in the power system operation. In such a situation, the inclusion of flexible resources which have the potential of facilitating wind power integration is necessary. Demand response (DR) programs and emerging utility-scale energy storages (ESs) are known as two powerful flexible tools that ca...

متن کامل

A Bilevel Scheduling Approach for Modeling Energy Transaction of Virtual Power Plants in Distribution Networks

By increasing the use of distributed generation (DG) in the distribution network operation, an entity called virtual power plant (VPP) has been introduced to control, dispatch and aggregate the generation of DGs, enabling them to participate either in the electricity market or the distribution network operation. The participation of VPPs in the electricity market has made challenges to fairly a...

متن کامل

Multi-objective and Scalable Heuristic Algorithm for Workflow Task Scheduling in Utility Grids

 To use services transparently in a distributed environment, the Utility Grids develop a cyber-infrastructure. The parameters of the Quality of Service such as the allocation-cost and makespan have to be dealt with in order to schedule workflow application tasks in the Utility Grids. Optimization of both target parameters above is a challenge in a distributed environment and may conflict one an...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015