Nuclear Power Plant Load Following: Problem Definition and Application

نویسنده

  • Blaže Gjorgiev
چکیده

The general opinion about nuclear power plants is that they are not flexible generating units characterized with low or no load following capabilities. Therefore they should be used as baseline units only. Given the economic perspective of this issue, it is clear that the reasons for use of nuclear power plants as baseline units are purely economic. They have the lowest variable costs compared with the other thermal generating units. It is of crucial importance to note that the flexibility and reliability of the power system directly depends on the flexibility and reliability of the generating units. Therefore it is very important to have flexible units which will be available to follow load in any time of the day. This is especially important in power systems where nuclear power has great portion in the power production. In such case the conventional units which are used for load following may not be enough to secure reliable operation of the power system. The objective of this paper is to investigate the parameters from nuclear safety, which may be affected by load following manoeuvres. For this purpose an existing probabilistic safety assessment model of nuclear power plant from generation III+ is used. The first step is identification of components and systems from the nuclear power plant which are affected from the load following and subsequent adaptation of the existing probabilistic model. The second step is testing of the model for any changes in core damage frequency. The expected results indicate no significant decrease in core damage frequency due to the extensive use of load following.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Application of Fuzzy Linear Programming in Optimal Load Shedding and Generation Reallocation Problem

In this article, an effective method to control a power system during emergency conditions is presented. Based on Fuzzy Linear Programming (FLP), a new technique is developed to solve the Load Shedding and Generation Reallocation (LSGR) optimization Problem. The objective function consists of terms of load curtailments and deviations in generation schedules. The constraints are power system var...

متن کامل

Application of Fuzzy Linear Programming in Optimal Load Shedding and Generation Reallocation Problem

In this article, an effective method to control a power system during emergency conditions is presented. Based on Fuzzy Linear Programming (FLP), a new technique is developed to solve the Load Shedding and Generation Reallocation (LSGR) optimization Problem. The objective function consists of terms of load curtailments and deviations in generation schedules. The constraints are power system var...

متن کامل

Application of TCSC and SVC to Enhance the Power System Static Voltage Stability

In this paper, the performance of two types of FACTS devices in order to enhance the power system static voltage stability has been investigated. These devices include Static Var Compensator (SVC) and Thyristor Controlled Series Capacitor (TCSC). The modeling of the Single Machine Infinite Bus (SMIB) and aforesaid devices has been made up in steady state mode with disregarding of the generator ...

متن کامل

Control Technology for a Daily Load-following Operation in a Nuclear Power Plant

In Korea, the technology of a load fo nuclear power plant has been being developed. automatic controller which is able to control temperature and axial power distribution was automatic controller is functionally divided identification algorithm and a model predictive con former transforms the nuclear reactor status into numerically. And the latter uses them and ge manipulated values such as two...

متن کامل

Application of Tabu Search to Optimal Placement of Distributed Generation and Reactive Power Sources

Introducing distributed generation into a power system can lead to numerous benefits including technical, economic, environmental, etc. To attain these benefits, distributed generators with proper rating should be installed at suitable locations. Given the similar effects of distributed generators and capacitor banks on operation indices of a distribution system, simultaneous assignment of best...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011