Robust Periodic Planning and Execution

نویسنده

  • Barney Pell
چکیده

The New Millennium Remote Agent (NMRA) will be the first on-board AI svstem to control an actual spacecraft. The ~pacecraft domain raises a number of challenges for planning and execution, ranging from extended agency and long-term planning to dynamic recoveries and robust concurrent execution, all in the presence of tight real-time deadlines, changing goals, scarce resource constraints, and a wide variety of possible failures. NMRA is one of the first systems to integrate closed-loop planning and execution of concurrent temporal plans. It is also the first autonomous system that will be able to achieve a susta:lned, multi-stage, multiyear mission without communication or guidance from earth.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Robust Periodic Planning and Execution for Autonomous Spacecraft

The New Mil lennium Remote Agent (NMRA) wil l be the first on-board AI system to cont ro l an actual spacecraft. The spacecraft domain raises a number of challenges for planning and execution, ranging from extended agency and long-term planning to dynamic recoveries and robust concurrent execution, all in the presence of t ight real-time deadlines, changing goals, scarce resource constraints, a...

متن کامل

A Multi-Period Robust Optimization Model for Integrated Planning of Decisions in the Petrochemical Products’ Supply Chain

  Optimal management and planning in the petrochemical industry will bring about many economic benefits, including depended industries. In this research we examine technical and operational planning in the petrochemical supply chain network to assess how to optimize periodic decisions such as inventory of raw materials and products, pricing, transportation and flow of materials and products. In...

متن کامل

Developing Robust Project Scheduling Methods for Uncertain Parameters

A common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. As a result, project managers are often unable to meet the deadline time of the milestones. Robust project scheduling is an effective approach in case of uncertainty. Upon adopting this approach, schedules are protected against po...

متن کامل

Stable Gait Planning and Robustness Analysis of a Biped Robot with One Degree of Underactuation

In this paper, stability analysis of walking gaits and robustness analysis are developed for a five-link and four-actuator biped robot. Stability conditions are derived by studying unactuated dynamics and using the Poincaré map associated with periodic walking gaits. A stable gait is designed by an optimization process satisfying physical constraints and stability conditions. Also, considering...

متن کامل

Integrated Demonstration of Instrument Placement, Robust Execution and Contingent Planning

This paper describes an integrated demonstration of ground-based contingent planning, robust execution and autonomous instrument placement for the efficient exploration of a site by a prototype Mars rover.

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013