Recent Developments of Computational Intelligence for Resource Constrained Project Scheduling Problems: A Taxonomy and Review

نویسنده

  • Omar S. Soliman
چکیده

This article presents a broad overview of applications of Computational Intelligence (CI) paradigms in resource constrained project scheduling problems (RCPSP) including Fuzzy system (FS), Artificial Neural Networks (ANN), Particle Swarm Optimization (PSO), Tabu Search (TS), Genetic Algorithms (GA), Simulated Annealing (SA) and other metaheuristics techniques. Recent developments of computational intelligence techniques and its implementations to project scheduling problems are reviewed. Various types of RCPSP and its extensions as a single objective and multiobjective models are introduced. Applications of CI techniques to RCPSP are classified and analyzed on various dimensional including CI paradigms, publication years and numbers, type of RCPSP models as single objective optimization model and multiobjective model as well as RCPSP with renewable, nonrenewable, partially renewable resource constrained. In addition to, a discussion of how these CI paradigms could be applied to solve RCPSP problems and how RCPSP could be analyzed, processed, and optimized using CI paradigms. Challenges and promising research directions in the field of CI and RCPSP are addressed. Keywords— Resource constrained project scheduling, Multimode, Combinatorial Optimization, Computational intelligence, Hybrid Computational Intelligence.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project

This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...

متن کامل

The preemptive resource-constrained project scheduling problem subject to due dates and preemption penalties: An integer programming approach

Extensive research has been devoted to resource constrained project scheduling problem. However, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. In this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...

متن کامل

Uncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem

Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...

متن کامل

Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)

Resource constrained project scheduling problem (RCPSP) is mainly investigated with the objective of either minimizing project makespan or maximizing project net present value. However, when material planning plays a key role in a project, the existing models cannot help determining material ordering plans to minimize material costs. In this paper, the RCPSP incorporated with the material order...

متن کامل

An Exact Algorithm for the Mode Identity Project Scheduling Problem

In this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (MRCPSP) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming one subset have to be processed in the same mode. We present a depth-first branch and bound algorithm for the resource constrained project schedulin...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014