Performance Modeling of A Pro-Active Multi-Tier Dynamic Scheduling Algorithm With Threshold Deriviations

نویسندگان

  • Deriviations S. Shamala
  • M. Y. Saman
  • M. Othman
  • R. Johari
چکیده

The Internet has revolutionized the culture of computing and telecommunications. The emergence of newly designed real-time multimedia applications is creating a pressing need to redesign and revamp the Internet architectures, algorithms and protocols. Scheduling algorithms are an integral component in determining the performance of packet-switched networks. Extensive research have been performed to derive the ideal correlation between scheduling algorithms, resource management and admission control. In this study, two new pro-active dynamic multi-tier scheduling algorithms for output-buffered switches with a priority and threshold derivation mechanisms are proposed. The two models are designed on the basis of the predictive service model. The proposed bandwidth and buffer management schemes are performed dynamically. A pro-active admission control algorithm is also proposed. The admission control algorithm utilizes a recursive formula to compute the probability of a packet incurring an estimated delay exceeding the stipulated service requirements. The second model integrates an additional threshold feature in the dynamic and pro-active compositions. The performance of the two proposed multi-tier scheduling algorithm is compared with the OCcuPancy_Adjusting (OCP_A) scheduling algorithm via extensive discrete-event simulation models. The simulation results demonstrate that the proposed multi-tier dynamic scheduling algorithms provide significant improvements as compared to the OCP_A.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Integrated modeling and solving the resource allocation problem and task scheduling in the cloud computing environment

Cloud computing is considered to be a new service provider technology for users and businesses. However, the cloud environment is facing a number of challenges. Resource allocation in a way that is optimum for users and cloud providers is difficult because of lack of data sharing between them. On the other hand, job scheduling is a basic issue and at the same time a big challenge in reaching hi...

متن کامل

َA Multi-objective simulated annealing algorithm to solving flexible no-wait flowshop scheduling problems with transportation times

This paper deals with a bi-objective hybrid no-wait flowshop scheduling problem minimizing the makespan and total weighted tardiness, in which we consider transportation times between stages. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time by using traditional approaches and optimization tools is extremely difficult. This paper presen...

متن کامل

A modified branch and bound algorithm for a vague flow-shop scheduling problem

Uncertainty plays a significant role in modeling and optimization of real world systems. Among uncertain approaches, fuzziness describes impreciseness while for ambiguity another definition is required. Vagueness is a probabilistic model of uncertainty being helpful to include ambiguity into modeling different processes especially in industrial systems. In this paper, a vague set based on dista...

متن کامل

Scheduling Single-Load and Multi-Load AGVs in Container Terminals

In this paper, three solutions for scheduling problem of the Single-Load and Multi-Load Automated Guided Vehicles (AGVs) in Container Terminals are proposed. The problem is formulated as Constraint Satisfaction and Optimization. When capacity of the vehicles is one container, the problem is a minimum cost flow model. This model is solved by the highest performance Algorithm, i.e. Network Simple...

متن کامل

Pareto-based Multi-criteria Evolutionary Algorithm for Parallel Machines Scheduling Problem with Sequence-dependent Setup Times

This paper addresses an unrelated multi-machine scheduling problem with sequence-dependent setup time, release date and processing set restriction to minimize the sum of weighted earliness/tardiness penalties and the sum of completion times, which is known to be NP-hard. A Mixed Integer Programming (MIP) model is proposed to formulate the considered multi-criteria problem. Also, to solve the mo...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2002