Effect of Data Acquisition Accuracy on Timing of Stand Harvests and Expected Net Present Value

نویسندگان

  • Markus Holopainen
  • Mervi Talvitie
چکیده

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimising the Management of a Heterogeneous Stand

The study presents a method for taking the heterogeneity of the stand into account in the optimisation of stand management. Heterogeneity refers to within-stand variation in stand density and/or other characteristics. A set of plots, corresponding to different sub-areas of the stand, represents the stand in calculations. Cuttings and other treatments of the plots are done simultaneously. The me...

متن کامل

A Review of Mutual Investment Funds Performance with a View of Market Timing

Appropriate function of active management in common investment funds function depend on factors such as diversification, identification papers unrealistic pricing, market timing, and so on. Market timing are include changing the portfolio investment funds and market indices such as short-term bonds and make an asset depends on whether the market is expected in the whole of the assets to make be...

متن کامل

Developing a method for identification of net zones using log data and diffusivity equation

Distinguishing productive zones of a drilled oil well plays a very important role for petroleum engineers to decide where to perforate to produce oil. Conventionally, net pay zones are determined by applying a set of cut-offs on perophysical logs. As a result, the conventional method finds productive intervals crisply. In this investigation, a net index value is proposed, then; diffusivity equa...

متن کامل

Project scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case study

Today's competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According to their priority and their latency, so that between the time the project is completed and ...

متن کامل

The Effect of Knowledge of Result Feedback Timing on Speech Motor Learning in Healthy Adults

Objectives: The current study mainly aimed at studying the effect of Knowledge of Result (KR) feedback timing and result-estimation opportunity before receiving delayed KR on learning a new speech motor skill in monolingual healthy adults.  Methods: Thirty-nine Persian healthy adults were randomly divided into three groups. Each group received immediate KR, delayed KR (after eight seconds), or...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006