Onthe Complexity of Delayingan Adversary’s Project
نویسندگان
چکیده
A “project manager” wishes to complete a project (e.g., a weaponsdevelopment program) as quickly as possible. Using a limited interdiction budget, an “interdictor” wishes to delay the project’s overall completion time by interdicting and thereby delaying some of the project’s component tasks. We explore a variety of PERT-based interdiction models for such problems and show that the resulting problem complexities run the gamut: polynomially solvable, weakly NP-complete, strongly NP-complete or NP-hard. We suggest methods for solving the problems that are easier than worst-case complexity implies.
منابع مشابه
Developing a fuzzy group decision making approach for project manager selection considering the static complexity of construction projects
Due to the particular importance of projects in human life and in organizations, proper project management has been always regarded highly by researchers and practitioners. Recent advances in technology and fundamental changes in most scientific areas have affected projects and made their nature and environmental circumstances much more complex than in the past. Fortunately, in recent years, ma...
متن کاملA MULTI-OBJECTIVE OPTIMIZATION MODEL FOR PROJECT PORTFOLIO SELECTION CONSIDERING AGGREGATE COMPLEXITY: A CASE STUDY
Existing project selection models do not consider the complexity of projects as a selection criterion, while their complexity may prolong the project duration and even result in its failure. In addition, existing models cannot formulate the aggregate complexity of the selected projects. The aggregated complexity is not always equal to summation of complexity of projects because of possible syne...
متن کاملProject Complexity on CoPS Projects: The 5P Model (Purpose, Product, Process, People, Peripheral)
The concept of "complexity" is familiar to most of project's managers, but it is not comprehended in the same way. although the complexity highlights negative points, but it may bring positive advantages which support the project. Researches conducted on this field show that the understanding of "complexity" between the researchers is different and it is mainly depends on th...
متن کاملA Heuristic Algorithm for Project Scheduling Problem to Maximizing the Net Present Value
This paper deals with resource unconstrained project scheduling problems with the objective of maximizing the net present value (NPV) of project cash flows. Here we present a heuristic algorithm named as differential procedure (Dif_AOA). In order to evaluate the efficiency of this algorithm, networks with node numbers between 10-1000 and network complexity coefficients between 1.3-6.6 have be...
متن کاملA Heuristic Algorithm for Project Scheduling Problem to Maximizing the Net Present Value
This paper deals with resource unconstrained project scheduling problems with the objective of maximizing the net present value (NPV) of project cash flows. Here we present a heuristic algorithm named as differential procedure (Dif_AOA).
In order to evaluate the efficiency of this algorithm, networks with node numbers between 10-1000 and network complexity coefficients between 1.3-6.6 have ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2005