MRP Offsetting for Assembly Systems with Random Component Delivery Times: A Particular Case

نویسندگان

  • Mohamed Aly Ould Louly
  • Alexandre Dolgui
چکیده

This paper considers component supply planning for assembly systems where several types of components are needed to produce one finished product. The actual component lead times have random deviations. The aim of this study is to find the optimal MRP offsetting when the Periodic Order Quantity (POQ) policy is used. The proposed model and algorithms minimize the sum of the setup and average holding costs for the components, while satisfying a desired service level for finished product.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A chance-constrained multi-objective model for final assembly scheduling in ATO systems with uncertain sub-assembly availability

A chance-constraint multi-objective model under uncertainty in the availability of subassemblies is proposed for scheduling in ATO systems. The on-time delivery of customer orders as well as reducing the company's cost is crucial; therefore, a three-objective model is proposed including the minimization of1) overtime, idletime, change-over, and setup costs, 2) total dispersion of items’ deliver...

متن کامل

Genetic algorithm for multi-level assembly systems under stochastic lead times

The aim of this paper is to propose tools to adapt and parameterize the Material Requirement Planning (MRP) method under lead time uncertainty. We study multi-level assembly systems with one type of finished products and several types of components. We consider that each component has a fixed unit inventory cost and the finished product has a backlogging cost per unit of time. The lead times of...

متن کامل

Multi-Objective Lead Time Control in Multistage Assembly Systems (TECHNICAL NOTE)

In this paper we develop a multi-objective model to optimally control the lead time of a multistage assembly system. The multistage assembly system is modeled as an open queueing network, whose service stations represent manufacturing or assembly operations. The arrival processes of the individual parts of the product, which should be assembled to each other in assembly stations, are assumed to...

متن کامل

Particle swarm optimization for minimizing total earliness/tardiness costs of two-stage assembly flowshop scheduling problem in a batched delivery system

This paper considers a two-stage assembly flow shop scheduling problem. When all parts of each product are completed in the first stage, they are assembled into a final product on an assembly machine in the second stage. In order to reduce the delivery cost, completed products can be held until completion of some other products to be delivered in a same batch. The proposed problem addresses sch...

متن کامل

Calculating safety stocks for assembly systems with random component procurement lead times: A branch and bound algorithm

In this paper, a discrete single-level multi-component inventory control model for assembly systems with random component procurement lead times is considered. The economic order quantity (EOQ) policy is used for a type of finished product. The requirements of the components are constant and cyclic (periodic), and their values per period are deduced from the EOQ for the finished product. The pa...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2009