On the Economics of Huge Requirements of the Mass Storage - A Case Study of the AGATA Project
نویسندگان
چکیده
The AGATA is a shell detector for gamma-ray spectroscopy. At the present stage of the project the AGATA collaboration is running an AGATA-demonstrator, which is a small part (only 12 Germanium crystals) of the future full AGATA spectrometer (180 crystals). The AGATA-demonstrator is producing a huge amount of raw-data with a high throughput. This paper focuses on the economics study regarding various options of data storage for the AGATA spectrometer. We discuss the raw-data storage requirements on the demonstrator and the forecasted storage size requirements for the full AGATA spectrometer. We also analyze the data communication requirements. The case study focuses in costs analysis of three options: a dedicated storage, a Grid storage and a Cloud storage service. In this manner, we explain how a huge size mass storage can be affordable, and why the costs savings depends more in the particularity of the problems than in general estimations. The results show a lower total costs for the Grid option.
منابع مشابه
Project Managers Competencies based on ICB and Project Management Processes based on PMBOK in Project Based Organization (Case study: Hydropower Plants Management)
Effective implementation of managerial systems needs software and hardware requirements. Project management competencies of the managers is one of the most important and inevitable requirements to ensure the success of the projects in any industry. Inorder to clarify the requirements, many international and professional instituts have presented well-known frameworks to help the managers to shap...
متن کاملStability analysis and selection of optimuim support system of large scale underground space-Case study
The Azad pumped storage power plant including the pumping and transformer cavern and surge tanks has been located in the Sanandaj-Sirjan formation with the alternation of slate and phyllite and meta sandstone.Due to the sensitivity and special use of these spaces, stability analysis and ensuring the safety of carven is very important.Nowadays, using the surface storage tanks is very costly; The...
متن کاملUse of Quality Function Deployment for Gold Mining Feasibility Study (Case Study: Designing Explosive Storage Area)
In the mining industry, at the beginning of development of a project, a consultant is assigned to build a design feasibility study to incorporate the client requirement, government regulation, and other inputs into the design. The consultant usually faces overwhelmed stages due to changes caused by the client and other stakeholders and has to repeat the process of inputting requirements into th...
متن کاملMethodology based on MCDM for risk management in EPC projects: A Case Study of LPG Storage Tanks Construction
The most important aim of every project is on time completion, budget consideration and reaching the highest possible quality, based on contract. This paper suggests a methodology for risk management in engineering, procurement, and construction (EPC) projects. Risk management enables project teams to perform with minimum deviation from predetermined goals. The proposed methodology identifies a...
متن کاملAn Integrated Baseline Geodatabase for Facilitating the Environmental Impact Assessment Process: Case Study of Sabalan Geothermal Project, Iran
Baseline data represent one of the important stages of Environmental Impact Assessment (EIA) procedure that describes the existing environment of the study area and surrounding areas in enough detail to allow the environmental impacts of the proposed area to be accurately and adequately assessed, and future changes and effects can be measured. Baseline data may be inaccurate, difficult to obtai...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -