Dynamic Multipriority Patient Scheduling for a Diagnostic Resource
نویسندگان
چکیده
We present a method for dynamically scheduling multi-priority patients to a diagnostic facility in a public health care setting. Rather than maximizing revenue for the diagnostic facility, the challenge facing the resource manager is to allocate available capacity to incoming demand so that waiting time targets are achieved in a cost-effective manner. We will model the scheduling process as a Markov Decision Process. Since the state space is much too large for a direct solution, we solve the equivalent linear program through approximate dynamic programming. We present two theorems giving the optimal linear approximation for two potential cost structures of the scheduling process. Our results suggest an easily implementable booking policy that manages to maintain reasonable waiting times for a variety of demand streams.
منابع مشابه
A multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations
The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...
متن کاملIntelligent scheduling for emergency room(ER) personnel to improve productivity
Improving productivity in emergency services and managing limited resources of emergency room(ER) are key challenges for health managers of oil industry. One critical and costly resource is ER personnel and its lack can lead to long queue of patients. Thus appropriate scheduling for nurses and physicians can help ER managers to get maximum benefit of their current human resource and reduce th...
متن کاملA novel mathematical model for a hybrid flow shop scheduling problem under buffer and resource limitations-A case study
Scheduling problems play a big role in manufacturing and planning the production for increasing the production efficiency and assigning the resources to operations. Furthermore, in many manufacturing systems there is a physical space between stages that called intermediate buffers. In this study, a model is proposed for minimizing the makespan of a hybrid flow shop scheduling problem with inter...
متن کاملAn Efficient Approach for Bottleneck Resource(s) Detection Problem in the Multi-objective Dynamic Job Shop Environments
Nowadays energy saving is one of the crucial aspects in decisions. One of the approaches in this case is efficient use of resources in the industrial systems. Studies in real manufacturing systems indicating that one or more machines may also act as the Bottleneck Resource/ Resources (BR). On the other hand according to the Theory of Constraints (TOC), the efficient use of resources in manufact...
متن کاملUncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem
Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...