Planning and scheduling teams of skilled workers
نویسنده
چکیده
Solving problems that mix planning and scheduling are often seen as a challenge. Discrete time-based scheduling, along with complex side constraints does not mix well with the more flexible nature of the planning model. This is demonstrated in our experiments when trying to solve a problem where we must assemble teams of skilled workers to perform jobs that require these skills, break these teams and then assemble new ones to perform more jobs. The mixing of the planning part (grouping workers into teams) and the scheduling part (creating a schedule for each worker), along with some difficult side constraints and a large problem size (800 workers, 2000 jobs over one month) combine to contribute to the challenge of finding good solutions for this problem.
منابع مشابه
Managing Cost Salience and Procrastination in Projects: Compensation and Team Composition
The rising trend of projects with high-skilled and autonomous contributors increasingly exposes managers to the risk of idiosyncratic individual behaviors. In this paper, we examine the e ects of an important behavioral factor, an individual's cost salience. Cost salience leads individuals to perceive the cost of immediate e ort to be larger than the cost of future e ort. This leads to procrast...
متن کاملModeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition
In this study, we aim to present a new model for the resource-constrained project scheduling problem (RCPSP) considering a working calendar for project members and determined the skill factor of any member using the efficiency concept. For this purpose, the recyclable resources are staff resources where any person with multiple skills can meet the required skills of activities in a given time. ...
متن کاملOptimization-based planning to assess the level of disaster in the city
BACKGROUND AND OBJECTIVES: After having struck in a major natural disaster like an earthquake, different organizations run about to decrease losses. The lack of accurate demand information is a common problem that all emergency response organizations have to encounter such a crisis. Evaluation of the City disaster level is a mean to feed this informati...
متن کاملAssembly line balancing problem with skilled and unskilled workers: The advantages of considering multi-manned workstations
This paper address a special class of generalized assembly line balancing in which it is assumed that there are two groups of workers: skilled and unskilled ones. The skilled workers are hired permanently while the unskilled ones can be hired temporarily in order to meet the seasonal demands. It is also assumed that more than one worker may be assigned to each workstation. To show the adv...
متن کاملOptimization of an energy based bi-objective multi skilled resource investment project scheduling problem
Growing concern in the management of energy due to the increasing energy costs, has forced managers to optimize the amount of energy required to provide products and services. This research integrates an energy-based resource investment project-scheduling problem (RIP) under a multi-skilled structure of the resources. The proposed energy based multi skilled resource investment problem (EB-MSRIP...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- J. Intelligent Manufacturing
دوره 21 شماره
صفحات -
تاریخ انتشار 2010