Integrated Production and Distribution Scheduling Problems Related to Fixed Delivery Departure Dates and Weights of Late Orders

نویسندگان

  • Shanlin Li
  • Maoqin Li
چکیده

We consider an integrated production and distribution scheduling problem faced by a typical make-to-order manufacturer which relies on a third-party logistics (3PL) provider for finished product delivery to customers. In the beginning of a planning horizon, the manufacturer has received a set of orders to be processed on a single production line. Completed orders are delivered to customers by a finite number of vehicles provided by the 3PL company which follows a fixed daily or weekly shipping schedule such that the vehicles have fixed departure dates which are not part of the decisions. The problem is to find a feasible schedule that minimizes one of the following objective functions when processing times and weights are oppositely ordered: (1) the total weight of late orders and (2) the number of vehicles used subject to the condition that the total weight of late orders is minimum. We show that both problems are solvable in polynomial time.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Integrated production and distribution scheduling problems related with fixed delivery departure dates and number of late orders

*Correspondence: [email protected] Department of Mathematics, Taizhou University, Taizhou, Zhejiang 317000, P.R. China Abstract We consider an integrated production and distribution scheduling problem faced by a typical make-to-order manufacturer which relies on a third-party logistics provider for finished product delivery to customers. In the beginning of a planning horizon, the manufac...

متن کامل

Coordinating Order Acceptance and Batch Delivery for an Integrated Supply Chain Scheduling

This paper develops Order Acceptance for an Integrated Production-Distribution Problem in which Batch Delivery is implemented. The aim of this problem is to coordinate: (1) rejecting some of the orders (2) production scheduling of the accepted orders and (3) batch delivery to maximize Total Net Profit. A Mixed Integer Programming is proposed for the problem. In addition, a hybrid meta-heuristic...

متن کامل

Integrated Production-Distribution Scheduling to Optimize the Tradeoff between Order Delivery Performance and Total Cost

The scheduling problem we consider is often faced by manufacturers who make time-sensitive products such as fashion apparel and toys, which typically have large product types and sell only during specific seasons. Consider the production and distribution scheduling decisions such a manufacturer needs to make. The customers (e.g. distributors or retailers) often set due dates on the orders they ...

متن کامل

Integrated model for pricing, delivery time setting, and scheduling in make-to-order environments

Usually, in make-to-order environments which work only in response to the customer’s orders, manufacturers for maximizing the profits should offer the best price and delivery time for an order considering the existing capacity and the customer’s sensitivity to both the factors. In this paper, an integrated approach for pricing, delivery time setting and scheduling of new arrival orders are prop...

متن کامل

Integrated Procurement, Production and Delivery Scheduling in a Generalized three Stage Supply Chain

In this research, we investigate a three-stage supply chain with one supplier, several manufacturers and multiple retailers where the supplier provides a common raw material to each manufacturer, who in turn uses a single stage production facility to convert it into final products that are delivered at fixed lot sizes to retailers. An integrated economic procurement, production, and delivery mo...