Problem-Structure-Based Pruning for Cost-Optimal Planning
نویسندگان
چکیده
In this paper we focus on efficient methods for pruning the state space in costoptimal planning. The use of heuristics to guide search and prune irrelevant branches has been widely and successfully explored. However, heuristic computation at every node in the search space is expensive, so reducing the number of nodes to be considered by up-front analysis has great potential. Our contributions are not concerned with heuristic guidance, rather completeness-preserving pruning techniques that reduce the number of states a planner must explore to find an optimal solution. We focus on search space reduction and aim to draw the attention of the optimal planning community towards pruning techniques based on problem analysis that are orthogonal to the use of heuristics. We present results showing that our techniques can improve upon state-of-the-art optimal planners, both when using blind search and importantly in conjunction with modern heuristics, thus improving their potential.
منابع مشابه
Completeness-Preserving Pruning for Optimal Planning
This paper focuses on efficient methods for pruning the state space in cost-optimal planning. The use of heuristics to guide search and prune irrelevant branches has been widely and successfully explored. However, heuristic computation at every node in the search space is expensive, and even near perfect heuristics still leave a large portion of the search space to be explored [9]. Using up-fro...
متن کاملIntegrating Partial Order Reduction and Symmetry Elimination for Cost-Optimal Classical Planning
Pruning techniques based on partial order reduction and symmetry elimination have recently found increasing attention for optimal planning. Although these techniques appear to be rather different, they base their pruning decisions on similar ideas from a high level perspective. In this paper, we propose safe integrations of partial order reduction and symmetry elimination for cost-optimal class...
متن کاملتعیین نوع و زمانبندی بهینه نگهداری و تعمیرات پیشگیرانه سیستمهای چندجزیی بر اساس قابلیت اطمینان
In this research, a model for optimal PM planning based on reliability is developed and solved for multi-component systems. In the proposed model, the type of PM actions for each inspection period is determined in such manner that the total weighted related costs are minimized while a minimum required system reliability is maintained. The planning horizon is divided into some inspections interv...
متن کاملDirect Optimal Motion Planning for Omni-directional Mobile Robots under Limitation on Velocity and Acceleration
This paper describes a low computational direct approach for optimal motion planning and obstacle avoidance of Omni-directional mobile robots within velocity and acceleration constraints on the robot motion. The main purpose of this problem is the minimization of a quadratic cost function while limitation on velocity and acceleration of robot is considered and collision with any obstacle in the...
متن کاملTwo Mathematical Models for Railway Crew Scheduling Problem
Railway crew scheduling problem is a substantial part of the railway transportation planning, which aims to find the optimal combination of the trip sequences (pairings), and assign them to the crew complements. In this problem, each trip must be covered by at least one pairing. The multiple-covered trips lead to impose useless transfers called “transitions”. In this study, a new ma...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2010