In the processing industries multiproduct batch plants are widespread production facilities for small amounts of high-valued products. These plants usually consist of various stages comprising several processing units each, which are predominately driven in batch mode. To operate these plants efficiently, limited resources have to be assigned to certain processing tasks in order to optimize the economic return under various constraints. These scheduling problems have to be solved under real-time conditions, i.e. in relatively short computing time with incomplete information. They are addressed by a number of approaches from the mathematical programming domain, but only few of them contain explicit representation of uncertain data. Uncertainty conscious algorithms usually generate single staged schedules, which optimize flexibility indices and/or certain expectation values. Our approach is conceptually different from those above inasmuch as the possibility of recourse actions is modeled by means of two-stage stochastic integer programs. Deterministic equivalents can be formulated as large MILPs with a block-angular matrix structure; they are solved by a dual decomposition approach based on Lagrangian relaxation of the nonanticipativity constraints. We will present a production process from the polymer industries as a real-world benchmark problem. The scheduling task is dominated by the strong coupling of substances and units and the significant uncertainties of demands and the process itself. The focus of the presentation is on the master scheduling problem as part of a twolayer cascade-like feedback structure. It is stated as a large-scale multiperiod model with accurately formulated capacity constraints and realistic production goals. The program with integer first and second stages and 1,000 scenarios of right hand-side uncertainties consists of 140,022 integer variables, 448,000 continuous variables and 736,009 constraints. It is solved within 4 hours CPU time with optimality gaps of some 5%, which proves the real-time applicability of the proposed approach. 1 Department of Chemical Engineering Universität Dortmund D-44221 Dortmund, Germany [email protected] [email protected] 2 Department of Mathematics Gerhard-Mercator-Universität Duisburg D-47048 Duisburg, Germany [email protected] [email protected]

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Stochastic Model for Prioritized Outpatient Scheduling in a Radiology Center

This paper discussed the scheduling problem of outpatients in a radiology center with an emphasis on priority. To more compatibility to real-world conditions, we assume that the elapsed times in different stages to be uncertain that follow from the specific distribution function. The objective is to minimize outpatients’ total spent time in a radiology center. The problem is formulated as a fle...

متن کامل

Stochastic Short-Term Hydro-Thermal Scheduling Based on Mixed Integer Programming with Volatile Wind Power Generation

This study addresses a stochastic structure for generation companies (GenCoʼs) that participate in hydro-thermal self-scheduling with a wind power plant on short-term scheduling for simultaneous reserve energy and energy market. In stochastic scheduling of HTSS with a wind power plant, in addition to various types of uncertainties such as energy price, spinning /non-spinning reserve prices, unc...

متن کامل

Two-stage fuzzy-stochastic programming for parallel machine scheduling problem with machine deterioration and operator learning effect

This paper deals with the determination of machine numbers and production schedules in manufacturing environments. In this line, a two-stage fuzzy stochastic programming model is discussed with fuzzy processing times where both deterioration and learning effects are evaluated simultaneously. The first stage focuses on the type and number of machines in order to minimize the total costs associat...

متن کامل

A fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates

This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...

متن کامل

Application of stochastic programming for iron ore quality control

Stockpiling and blending play a major role in maintaining the quantity and quality of the raw materials fed into processing plants, especially the cement, iron ore and steel making, and coal-fired power generation industries that usually require a much uniformed feed. Due to the variable nature of such materials, they even come from the same source and the produced ores or concentrates are seld...

متن کامل

A stochastic model for project selection and scheduling problem

Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...