Planning in assembly systems - A common modeling for products and resources

نویسندگان

  • Julien Provost
  • Bengt Lennartson
  • Martin Fabian
  • Åsa Fasth
  • Johan Stahre
چکیده

This paper presents a method for modeling robot and human resources in the context of assembly systems planning. In assembly systems, several redundant resources can be used to increase system flexibility. However, the “quality” of a sequence planning strongly depends on the “quality” of the system modeling. Furthermore, occurrence of unexpected events or variations in availability of resources may have significant impact on the actual planning. Instead of using simplistic models such as available or unavailable resources, the method presented in this paper proposes a more detailed modeling of resource abilities. Products and resources are considered on the same levels and matched together on a final step. The aim of this modeling is to permit analyses and to increase system flexibility.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Stochastic Security Constrained Transmission and Battery Expansion Planning In Integrated Gas-Electricity Systems Considering High Penetration of Renewable Resources..

In this study, a new model is proposed to solve the problem of transmission and battery expansion planning considering integrated electricity and gas systems. The presented model is a bi-level stochastic planning model, where transmission and battery expansion planning modeling is done on one level, and gas network modeling is done on the other level. Here, the impact of the high penetration of...

متن کامل

A multi-objective genetic algorithm (MOGA) for hybrid flow shop scheduling problem with assembly operation

Scheduling for a two-stage production system is one of the most common problems in production management. In this production system, a number of products are produced and each product is assembled from a set of parts. The parts are produced in the first stage that is a fabrication stage and then they are assembled in the second stage that usually is an assembly stage. In this article, the first...

متن کامل

Human resources scheduling based on machines maintenance planning and human reliability level

In today's competitive market, quality has an important role in manufacturing system. The manufacturers attempt to maintain their production system in a proper condition to produce high quality products. One of the key factors to achieve this goal is maintenance policy. Most studies on maintenance focused on machines and less attention has been paid to human resources as the most important fact...

متن کامل

Ranking Effective Bases on Performance of Human Resource Planning Systems (Correlation and Fuzzy Approach)

EnThe present research studied the relationship between organizational learning elements and human resources performance. Population of the research consisted of all managers Tehran Telecommunication Company. Data were collected through questionnaires which included 24 questions with seven items. To determine the impact and ranking theprinciples of organizational learning in performance of huma...

متن کامل

Modeling the Hybrid Flow Shop Scheduling Problem Followed by an Assembly Stage Considering Aging Effects and Preventive Maintenance Activities

Scheduling problem for the hybrid flow shop scheduling problem (HFSP) followed by an assembly stage considering aging effects additional preventive and maintenance activities is studied in this paper. In this production system, a number of products of different kinds are produced. Each product is assembled with a set of several parts. The first stage is a hybrid flow shop to produce parts. All ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012