Deflection Monitoring of the Forth Road Bridge by GPS

نویسندگان

  • Gethin Wyn Roberts
  • Chris Brown
  • Xiaolin Meng
چکیده

Researchers at the IESSG at the University of Nottingham, in conjunction with colleagues from Brunel University, have carried out deflection monitoring work on structures, notably bridges, for a decade. Initial work was carried out 101 ION GNSS 18th International Technical Meeting of the Satellite Division, 13-16 September 2005, Long Beach, CA on the Humber Bridge, London’s Millennium Bridge and the Wilford Footbridge in Nottingham. These trials were carried out over a number of years, using a whole succession of GPS receivers. The initial trials showed that the use of carrier phase GPS could indeed allow sub centimetre movements to be detected, in addition to which, the frequencies of the movements could be calculated. Today, the authors are carrying out such work using state of the art dual frequency surveying grade code and carrier phase GPS receivers. The Forth Road Bridge has an overall length of 2.5 km, a main span length of 1,005m, and was opened in 1964. Traffic has steadily increased over this bridge, from 4 million vehicles in 1964 to over 23 million in 2002. In addition, the heaviest commercial vehicles weighed 24 tonnes; the current limit is 44 tonnes. When the bridge opened, it brought to an end an 800 year history of ferryboat service across the river at Queensferry. Such bridges experience traffic loading greater than that initially anticipated. The following paper details how GPS can be used to evaluate the performance of such a structure. On the 8 and 9 February 2005, a series of tests was conducted upon the Forth Road Bridge in Scotland. During the trials, 7 Survey grade GPS receivers were located upon the bridge, and a further two located as reference stations adjacent to the structure. In addition, a high accuracy Applanix INS, POS-RS, was also located upon the bridge; this is the subject of another paper. Of the 7 receivers on the bridge, four were located at the 1/8, 1⁄4, 1⁄2 and 3⁄4 span on the East side of the deck, whilst a fifth was located at the 1⁄2 span on the west side of the bridge. A further two receivers were located on top of the two towers at the south end of the bridge. All the receivers gathered data, almost non-stop, for a 48 hour period, at a rate of 10Hz or 20 Hz. Leica 530, 510 and GPS1200 receivers were used during the trials. During the trials, a weather station was used to gather the wind speed and direction, as well as the temperature. This could then be used to evaluate the total force i.e. wind and traffic, experienced by the bridge.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Deflection Measurement of Masonry Arch Bridges with Tall Piers: Case Study of Shahbazan Bridge

A common practice for detailed assessment of masonry bridges is to use recorded deflection signature of mid-span of such structures due to predefined loading schemes. However, measuring the deflection of bridges with tall piers or those situated over deep valleys introduces certain difficulties, since common deflection-meters require a reference point relative to which the measureme...

متن کامل

Dynamic characteristic of the forth road bridge estimated with GeoSHM

The importance of bridge health monitoring and management has been recognized by authorities of long-span bridges throughout the world in recent years. The GeoSHM consortium, led by the University of Nottingham, was awarded a Feasibility Study (FS) grant in 2013 by the European Space Agency (ESA) to investigate how to use integrated GNSS and Earth Observation technologies for the structural hea...

متن کامل

A Road Map for Civil Engineers towards Bridge Engineering Through Academic Education and Professional Training

It is common in many countries that engineers having an academic degree in Civil Engineering are appointed responsible for different tasks related to Bridge Engineering. However, there are serious questions about whether formal university courses in civil engineering could cover the needs of a bridge engineer to fulfill his or her job successfully. Regarding the recent significant advances in t...

متن کامل

A Critical Analysis of the Forth Road Bridge, Queensferry, Scotland

This conference paper presents a critical analysis of the Forth Road Bridge, addressing factors such as aesthetics, strength, construction methods and geotechnical design, in addition to discussing the bridge’s durability issues and future. Loading and strength analyses are carried out to BS5400-2, issued in 2006, providing a pertinent consideration of the impact of the increased vehicle loads ...

متن کامل

Application of Inclinometer in Arch Bridge Dynamic Deflection Measurement

Dynamic deflection measurement is an important component to the bridge loading experiment or health monitoring. Using high-precision inclinometers to test the dynamic deflection is a good method for High-Speed Railway Bridge deflection measurement in this paper, we develop a kind of precision inclinometer which comprehensives the Capacitive sensor technology and the Servo sensor technology and ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005