Multiple cross-docks scheduling using two meta-heuristic algorithms

نویسندگان

  • Mansooreh Madani-Isfahani
  • Reza Tavakkoli-Moghaddam
  • B. Naderi
چکیده

This paper considers a truck scheduling problem in a multiple cross docks while there is temporary storage in front of the shipping docks. Receiving and shipping trucks can intermittently move in and out of the docks during the time intervals between their task execution, in which trucks can enter to any of the cross docks. Thus, a mixed-integer programming (MIP) model for multiple cross docks scheduling is developed inspired by models in the body of the respective literature. Its objective is to minimize the total operation time or maximize the throughput of the cross-docking system. Moreover, additional concepts considered in the new method is multiple cross docks with a limited capacity. In this study, there are two types of delay times. The first type occurs when there is a shipping truck change and the second one occurs when the current shipping truck does not load any product from a certain receiving truck or temporary storage and waits until its needed products arrive at the shipping docks. To solve the developed model, two meta-heuristics, namely simulated annealing (SA) and firefly algorithms (FA), are proposed. In addition, a procedure for trucks scheduling in a state of a constant discrete firefly algorithm for the discrete adaptation has been proposed. The experimental design is carried out to tune the parameters of algorithms. Finally, the solutions obtained by the proposed SA and FA are compared. 2014 Elsevier Ltd. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Trucks Scheduling to Reduce Delays in Multiple Cross-Docks Using Imperialist Competitive Algorithm

Cross docking is a logistics strategy that is now used by a large number of firms in the various industries. Cross docking effectively a significant reduction in transport costs, without increasing inventory and at the same time maintain the level of service to customers. It also can cross dock order to reduce cycle time, improve flexibility and responsiveness lead distribution network. In this...

متن کامل

Project scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case study

Today's competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According to their priority and their latency, so that between the time the project is completed and ...

متن کامل

Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)

Resource constrained project scheduling problem (RCPSP) is mainly investigated with the objective of either minimizing project makespan or maximizing project net present value. However, when material planning plays a key role in a project, the existing models cannot help determining material ordering plans to minimize material costs. In this paper, the RCPSP incorporated with the material order...

متن کامل

Location-Allocation and Scheduling of Inbound and Outbound Trucks in Multiple Cross-Dockings Considering Breakdown Trucks

This paper studies multiple cross-dockings where the loads are transferred from origins (suppliers) to destinations (customers) through cross-docking facilities. Products are no longer stored in intermediate depots and incoming shipments are consolidated based on customer demands and immediately delivered to them to their destinations. In this paper, each cross-docking has a covering radius tha...

متن کامل

A heuristic approach for multi-stage sequence-dependent group scheduling problems

We present several heuristic algorithms based on tabu search for solving the multi-stage sequence-dependent group scheduling (SDGS) problem by considering minimization of makespan as the criterion. As the problem is recognized to be strongly NP-hard, several meta (tabu) search-based solution algorithms are developed to efficiently solve industry-size problem instances. Also, two different initi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers & Industrial Engineering

دوره 74  شماره 

صفحات  -

تاریخ انتشار 2014