Uet-scheduling with Chain-type Precedence Constraints Uet|scheduling with Chain-type Precedence Constraints

نویسندگان

  • Gerhard J. Woeginger
  • Zhongliang Yu
چکیده

x{ Scope and Purpose. | We consider a scheduling problem in a two-processor system where (i) every job can be processed on only one machine and where (ii) there are chain-type precedence relations among the jobs. The goal is to minimize the makespan. This continues the work of Chang and Lee 1], Jansen 4] and of Kellerer and Woeginger 5]. Abstract. | We consider a special case of the precedence constrained scheduling problem of n unit execution time jobs on two parallel machines without preemption: The precedence constraints are chain-type, and each job can be processed on only one of the two machines. We show that this problem is NP-complete in general, and we derive an approximation algorithm with constant worst case guarantee.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimality of HLF for scheduling divide-and-conquer UET task graphs on identical parallel processors

The problem of scheduling a set of n unit execution time (UET) tasks subject to precedence constraints on m identical parallel processors is known to be N P -hard in the strong sense. However, polynomial time algorithms exist for some classes of precedence graphs. In this paper, we consider a class of divide-and-conquer graphs that naturally models the execution of the recursive control abstrac...

متن کامل

Preemptive Scheduling with Variable Profile, Precedence Constraints and Due Dates

This paper is concerned with the problem of scheduling preemptive tasks subject to precedence constraints in order to minimize the maximum lateness and the makespan. The number of available parallel processors is allowed to vary in time. It is shown that when an Earliest Due Date rst algorithm provides an optimal nonpreemptive schedule for unit-execution-time (UET) tasks, then the preemptive pr...

متن کامل

SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT

In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...

متن کامل

Single Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs

This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs. A mathematical model based on binary integer programming (BIP) is developed. By these precedence constraints, jobs can not start before completion of its all predecessors. The represented model is in two steps, in step one the earliest starting time of each job is computed, then the re...

متن کامل

Multi-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints

This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1993