Replenishment run time problem with machine breakdown and failure in rework
نویسندگان
چکیده
Recently, Chung published a paper in Expert Systems with Applications providing a correct solution procedure to the inventory system for the replenishment run time problem with machine breakdown and failure in rework in Lin and Chiu 〔2〕. In this short note, we provide a detailed discussion for the convex property in Chiu et al. 〔1〕, Lin and Chiu〔2〕and Chung〔3〕. Moreover, we will put forth an exact expression for the concave up and concave down sub-intervals to clearly solve the non-convex phenomenon. Our results will help researchers realize the importance of the findings of Chiu et al.〔1〕, Lin and Chiu 〔2〕and Chung〔3〕.
منابع مشابه
Producer′s Replenishment Policy for an EPQ Model with Rework and Machine Failure Taking Place in Backorder Reloading Time
This paper studies the optimal producer′s replenishment policy for an economic production quantity (EPQ) model with rework and breakdown taking place in backorder replenishing time. A recent published article has studied the lot-sizing problem on an imperfect quality EPQ model. However, another reliability factor random machine breakdown is inevitable in most real-life production systems. To de...
متن کاملEconomic Production Quantity Model with Backordering, Rework and Machine Failure Taking Place in Stock Piling Time
This paper investigates the optimal inventory replenishment policy for an economic production quantity (EPQ) model with backordering, rework and machine breakdown taking place in stock piling time. A prior paper by Chiu has examined the lot-sizing problem on an imperfect quality EPQ model. Due to another reliability factor random machine breakdown seems to be inevitable in most real world manuf...
متن کاملOptimal Run Time for EMQ Model with Backordering, Failure-In- Rework and Breakdown Happening in Stock-Piling Time
This study examines the optimal run time for the economic manufacturing quantity (EMQ) model with failure-in-work, backlogging, and random breakdown happening in stock-piling time. A recent article by Chiu and Chiu [Mathematical modeling for production system with backlogging and failure in repair, Journal of Scientific & Industrial Research, 65 (2006) 499-506] investigated optimal lot-size for...
متن کاملProduction Systems with Rework and Machine Failure Taking Place in Backorder Filling Time
This paper investigates the optimal refilling policy for an economic production quantity (EPQ) model with rework and breakdown taking place in backorder replenishing time. A recent published article [Chiu, Y.P., 2003. Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Engineering Optimization 35, 427-437] has studied...
متن کاملAn EPQ model with a random breakdown, rework, and a discontinuous issuing policy
This study attempts to determine the optimal production run time for an economic production quantity (EPQ) model with a Poisson breakdown rate, the rework of nonconforming items, and multi-delivery of finished products. It is assumed that nonconforming items can be randomly produced and repaired through a rework process added at the end of the production process. Production equipment is subject...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Expert Syst. Appl.
دوره 39 شماره
صفحات -
تاریخ انتشار 2012