High-throughput operation of sample-exchange robots with double tongs at the Photon Factory beamlines

نویسندگان

  • Masahiko Hiraki
  • Shokei Watanabe
  • Nobuo pHonda
  • Yusuke Yamada
  • Naohiro Matsugaki
  • Noriyuki Igarashi
  • Yurii Gaponov
  • Soichi Wakatsuki
چکیده

Sample-exchange robots that can exchange cryo-pins bearing protein crystals out of experimental hutches according to user instructions have been developed. The robots were designed based on the SAM (Stanford Synchrotron Research Laboratory automated mounting) system. In order to reduce the time required for the sample exchange, the single tongs of the SAM system were modified and a double-tongs system that can hold two cryo-pins at the same time was developed. Robots with double tongs can move to the goniometer head holding the next cryo-pin with one set of tongs, dismount the experimented cryo-pin with the other set, and then mount the next pin onto the goniometer head without leaving the diffractometer area. Two different types of tongs have been installed: single tongs at beamlines BL-5A and AR-NW12A, and a double-tongs system at beamline BL-17A of the Photon Factory. The same graphical user interface software for operation of the sample-exchange robots is used at all beamlines, however, so that users do not need to consider differences between the systems. In a trial, the robot with double tongs could exchange samples within 10 s.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Implementation of remote monitoring and diffraction evaluation systems at the Photon Factory macromolecular crystallography beamlines

Owing to recent advances in high-throughput technology in macromolecular crystallography beamlines, such as high-brilliant X-ray sources, high-speed readout detectors and robotics, the number of samples that can be examined in a single visit to the beamline has increased dramatically. In order to make these experiments more efficient, two functions, remote monitoring and diffraction image evalu...

متن کامل

Improvement of an automated protein crystal exchange system PAM for high-throughput data collection

Photon Factory Automated Mounting system (PAM) protein crystal exchange systems are available at the following Photon Factory macromolecular beamlines: BL-1A, BL-5A, BL-17A, AR-NW12A and AR-NE3A. The beamline AR-NE3A has been constructed for high-throughput macromolecular crystallography and is dedicated to structure-based drug design. The PAM liquid-nitrogen Dewar can store a maximum of three ...

متن کامل

[Advancement of synchrotron radiation protein crystallography in the targeted protein research program: beamline developments at the photon factory].

The Targeted Protein Research Program (TPRP) started in 2007 as a sequel of the Protein 3000 Project which lasted from 2002 to 2007. In the new project, four cores, Protein Production, Structure Analysis, Control of Protein Functions with Compounds, and Informatics, have been established as focus of methodology developments critical for functional and structural studies by the target protein re...

متن کامل

The Stanford Automated Mounter: pushing the limits of sample exchange at the SSRL macromolecular crystallography beamlines

The Stanford Automated Mounter System, a system for mounting and dismounting cryo-cooled crystals, has been upgraded to increase the throughput of samples on the macromolecular crystallography beamlines at the Stanford Synchrotron Radiation Lightsource. This upgrade speeds up robot maneuvers, reduces the heating/drying cycles, pre-fetches samples and adds an air-knife to remove frost from the g...

متن کامل

Progress towards a Revolute-joint Robot for the Precision Positioning of Material Samples or an X-ray Detector

At the Advanced Photon Source (APS), the desire to combine sample handling, sample positioning or goniometer functionality into one piece of equipment has provided the impetus for the development of a precision six degree-of-freedom robot with approximately 2 μm dynamic positioning uncertainty. This specification is driven by the need for a positioning uncertainty that should be 10 to 20 percen...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Journal of Synchrotron Radiation

دوره 15  شماره 

صفحات  -

تاریخ انتشار 2008