Bound-based decision rules in multistage stochastic programming
نویسندگان
چکیده
Forschungsplattform Alexandria https://www.alexandria.unisg.ch | 03.01.2016 We study bounding approximations for a multistage stochastic program with expected value constraints. Two simpler approximate stochastic programs, which provide upper and lower bounds on the original problem, are obtained by replacing the original stochastic data process by finitely supported approximate processes. We model the original and approximate processes as dependent random vectors on a joint probability space. This probabilistic coupling allows us to transform the optimal solution of the upper bounding problem to a nearoptimal decision rule for the original problem. Unlike the scenario tree based solutions of the bounding problems, the resulting decision rule is implementable in all decision stages, i. e., there is no need for dynamic reoptimization during the planning period. Our approach is illustrated with a mean-risk portfolio optimization model.
منابع مشابه
A Linear Decision-Based Approximation Approach to Stochastic Programming
Stochastic optimization, especially multistage models, is well known to be computationally excruciating. Moreover, such models require exact specifications of the probability distributions of the underlying uncertainties, which are often unavailable. In this paper, we propose tractable methods of addressing a general class of multistage stochastic optimization problems, which assume only limite...
متن کاملStep decision rules for multistage stochastic programming: A heuristic approach
Stochastic programming with step decision rules, SPSDR, is an attempt to overcome the curse of computational complexity of multistage stochastic programming problems. SPSDR combines several techniques. The first idea is to work with independent experts. Each expert is confronted with a sample of scenarios drawn at random from the original stochastic process. The second idea is to have each expe...
متن کاملA Defined Benefit Pension Fund ALM Model through Multistage Stochastic Programming
We consider an asset-liability management (ALM) problem for a defined benefit pension fund (PF). The PF manager is assumed to follow a maximal fund valuation problem facing an extended set of risk factors: due to the longevity of the PF members, the inflation affecting salaries in real terms and future incomes, interest rates and market factors affecting jointly the PF liability and asset p...
متن کاملMedium Term Hydroelectric Production Planning - A Multistage Stochastic Optimization Model
Multistage stochastic programming is a key technology for making decisions over time in an uncertain environment. One of the promising areas in which this technology is implementable, is medium term planning of electricity production and trading where decision makers are typically faced with uncertain parameters (such as future demands and market prices) that can be described by stochastic proc...
متن کاملScenario Trees and Policy Selection for Multistage Stochastic Programming Using Machine Learning
I the context of multistage stochastic optimization problems, we propose a hybrid strategy for generalizing to nonlinear decision rules, using machine learning, a finite data set of constrained vector-valued recourse decisions optimized using scenario-tree techniques from multistage stochastic programming. The decision rules are based on a statistical model inferred from a given scenario-tree s...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Kybernetika
دوره 44 شماره
صفحات -
تاریخ انتشار 2008