Heuristic Algorithms for Solving the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis
نویسندگان
چکیده
The resource constrained project scheduling problem (RCPSP) can be given as follows. A single project consists of a set J = {0,1, . . . ,n,n+1} of activities which have to be processed. Fictitious activities 0 and n+1 correspond to the “project start” and to the “project end”, respectively. The activities are interrelated by two kinds of constraints. First, precedence constraints force activity j not to be started before all its immediate predecessor activities comprised in the set P j have been finished. Second, performing the activities requires resources with limited capacities. We have K resource types, given by the set K = {1, . . . ,K}. While being processed, activity j requires r j,k units of resource type k ∈ K during every period of its non–preemptable duration p j. Resource type k has a limited capacity of Rk at any point in time. The parameters p j, r j,k, and Rk are assumed to be deterministic; for the project start and end activities we have p j = 0 and r j,k = 0 for all k ∈ K . The objective of the RCPSP is to find precedence and resource feasible completion times for all activities such that the makespan of the project is minimized. Figure 1 gives an example of a project comprising n = 6 activities which have to be scheduled subject to K = 1 renewable resource type with a capacity of 4 units. A feasible schedule with an optimal makespan of 13 periods is represented in Figure 2. Let Fj denote the finish time of activity j. A schedule S is given by a vector of finish times (F1,F2, . . . ,Fn). Let A(t) = { j ∈ J | Fj− p j ≤ t < Fj } be the set of activities which are being processed (active) at time instant t. We now can provide the conceptual decision model (1) – (4) (cf. Christofides et al. 1987).
منابع مشابه
Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)
Resource constrained project scheduling problem (RCPSP) is mainly investigated with the objective of either minimizing project makespan or maximizing project net present value. However, when material planning plays a key role in a project, the existing models cannot help determining material ordering plans to minimize material costs. In this paper, the RCPSP incorporated with the material order...
متن کاملOptimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms
The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...
متن کاملA Bi-objective Pre-emption Multi-mode Resource Constrained Project Scheduling Problem with due Dates in the Activities
In this paper, a novel mathematical model for a preemption multi-mode multi-objective resource-constrained project scheduling problem with distinct due dates and positive and negative cash flows is presented. Although optimization of bi-objective problems with due dates is an essential feature of real projects, little effort has been made in studying the P-MMRCPSP while due dates are included i...
متن کاملUncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem
Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...
متن کاملA multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...
متن کاملDetecting communities of workforces for the multi-skill resource-constrained project scheduling problem: A dandelion solution approach
This paper proposes a new mixed-integer model for the multi-skill resource-constrained project scheduling problem (MSRCPSP). The interactions between workers are represented as undirected networks. Therefore, for each required skill, an undirected network is formed which shows the relations of human resources. In this paper, community detection in networks is used to find the most compatible wo...