On a stochastic sequencing and scheduling problem
نویسندگان
چکیده
We present a framework for solving multistage pure 0–1 programs for a widely used sequencing and scheduling problem with uncertainty in the objective function coefficients, the constraint matrix and the right-hand side. The problem has the following form: given a set of operations to be executed along a time horizon, find a schedule to minimize a function included by the expected operations cost over the scenarios under consideration, subject to a set of constraints. Typical elements are: limited availability of the resources, multiperiod operations, subsets of operations with exclusivity and implicative constraints, precedence relationships in the execution of the operations, etc. The stochasticity is in the resources’ consumption by the operations, their availability and the operations cost along the time horizon. A multistage scenario analysis with complete recourse is used. Given the high dimensions of the problem and its combinatorial nature, it is not realistic to obtain the optimal solution for the problem. Instead, we present the socalled Fix-and-Relax Coordination algorithmic framework to exploit the characteristics of the non-anticipativity constraints for each scenario group in the stochastic model. This exploitation basically consists of selectively exploring the nodes of the branching trees in which the branch-and-bound tree is decomposed while the non-anticipativity constraints are relaxed. The algorithm is specifically designed for coordinating and reinforcing the node pruning, and the branching node and variable selection at each branching tree, such that the non-anticipativity constraints are satisfied. Some computational experience is reported. 2005 Elsevier Ltd. All rights reserved.
منابع مشابه
A stochastic model for project selection and scheduling problem
Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...
متن کاملA Stochastic Model for Prioritized Outpatient Scheduling in a Radiology Center
This paper discussed the scheduling problem of outpatients in a radiology center with an emphasis on priority. To more compatibility to real-world conditions, we assume that the elapsed times in different stages to be uncertain that follow from the specific distribution function. The objective is to minimize outpatients’ total spent time in a radiology center. The problem is formulated as a fle...
متن کاملThree Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint
Stochastic flexible flow shop scheduling problem (SFFSSP) is one the main focus of researchers due to the complexity arises from inherent uncertainties and also the difficulty of solving such NP-hard problems. Conventionally, in such problems each machine’s job process time may encounter uncertainty due to their relevant random behaviour. In order to examine such problems more realistically, fi...
متن کاملStochastic Short-Term Hydro-Thermal Scheduling Based on Mixed Integer Programming with Volatile Wind Power Generation
This study addresses a stochastic structure for generation companies (GenCoʼs) that participate in hydro-thermal self-scheduling with a wind power plant on short-term scheduling for simultaneous reserve energy and energy market. In stochastic scheduling of HTSS with a wind power plant, in addition to various types of uncertainties such as energy price, spinning /non-spinning reserve prices, unc...
متن کاملA Mathematical Model for a Flow Shop Scheduling Problem with Fuzzy Processing Times
This paper presents a mathematical model for a flow shop scheduling problem consisting of m machine and n jobs with fuzzy processing times that can be estimated as independent stochastic or fuzzy numbers. In the traditional flow shop scheduling problem, the typical objective is to minimize the makespan). However,, two significant criteria for each schedule in stochastic models are: expectable m...
متن کاملTwo-stage fuzzy-stochastic programming for parallel machine scheduling problem with machine deterioration and operator learning effect
This paper deals with the determination of machine numbers and production schedules in manufacturing environments. In this line, a two-stage fuzzy stochastic programming model is discussed with fuzzy processing times where both deterioration and learning effects are evaluated simultaneously. The first stage focuses on the type and number of machines in order to minimize the total costs associat...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Computers & OR
دوره 34 شماره
صفحات -
تاریخ انتشار 2007