Scheduling Forest Road Maintenance Using the Analytic Hierarchy Process and Heuristics

نویسندگان

  • Elizabeth Dodson Coulter
  • Michael G. Wing
چکیده

The management of low-volume roads has transitioned from focusing on maintenance designed to protect a capital investment in road infrastructure to also include environmental effects. In this study, two models using mathematical programming are applied to schedule forest road maintenance and upgrade activities involving non-monetary benefits. Model I uses a linear objective function formulation that maximizes benefit subject to budgetary constraints. Model II uses a non-linear objective function to maximize the sum of benefits divided by the sum of all costs in a period. Because of the non-linearity of the constraints and the requirements that the decision variables be binary, the solutions to both problem formulations are found using two heuristics, simulated annealing and threshold accepting. Simulated annealing was found to produce superior solutions as compared to threshold accepting. The potential benefit for completing a given road maintenance or upgrade project is determined using the Analytic Hierarchy Process (AHP), a multi-criterion decision analysis technique. This measure of benefit is combined with the economic cost of completing a given project to schedule maintenance and upgrade activities for 225 km (140 miles) of road in forested road systems within western Oregon. This combination of heuristics, cost-benefit analysis, environmental impacts, and expert judgment produces a road management schedule that better fits the current road management paradigm.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Planning road network in mountain forests using GIS and Analytic Hierarchical Process (AHP)

Forest road construction is the most costly operation in forestry. Road designing and construction in unsuitable areas may increase construction and maintenance costs and also cause many environmental impacts. Therefore, it is required to pay more attention to forest road design. In this research, we tried to introduce an appropriate method for locating forest roads using GIS and AHP simultaneo...

متن کامل

Forest road design combining common design techniques and GIS (Case Study: 2nd series of Liresar Forest)

Nowadays, it is necessary to apply modern techniques for the design of road networks, especially roads passing through ecosystems such as forests, in order to reduce operating costs, prevent further degradation of the environment, increase road efficiency and achieve sustainable development goals. In this paper, a new way of designing the road is presented. New design method has the ability to ...

متن کامل

Forest Road Design in Stable Location to Minimize Erosion (Case Study: Vaston District)

Soil erosion is of the most important environmental challenges and factors of forest damage, which is, occur because of the land use change, road construction and lack of vegetation cover. Forest soil is naturally penetrable but forest roads are not. This issue causes the flows runoff on road surface and washes soil particles. Thus, forest roads must be planned and constructed accurately. So, t...

متن کامل

Spatial Multi-Criteria Decision Process to Define Maintenance Priorities of Forest Road Network: an Application in the Italian Alpine Region

Nacrtak The combination of GIS tools and Analytic Hierarchy Process (AHP) techniques is used to develop a Decision Support System to rank the maintenance priorities of a forest road network according to the actual conditions and needs. The decision-making process is divided into 4 stages. The first stage fixes the objectives of the analysis as the minimization of the sediment production from ro...

متن کامل

Optimum Maintenance Strategy Selection using a Hybrid Approach based on Analytical Hierarchy Process and Revised Multi Choice Goal Programming

This study aims to select optimal maintenance strategy for components of an electric motor of the National Iranian Oil Refining and Distribution Company. In this regard, a method based on revised multi choice goal programming and analytic hierarchy process (AHP) is presented. Since improving the equipment reliability is an important issue, reliability centered maintenance (RCM) strategies are i...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006