Building Query Compilers ( Under Construction ) [ expected time to completion : 5 years ]
نویسنده
چکیده
منابع مشابه
The Nuts and Bolts of DBMS Construction: Building your Own Prototype
DBMS construction: DBMS construction: DBMS construction: DBMS construction: DBMS construction: DBMS construction: building your own prototype building your own prototype building your own prototype building your own prototype building your own prototype building your own prototype building your own prototype building your own prototype 2 3 Motivation • www.amazon.com: – 48 books on compiler con...
متن کاملDeveloping a BIM-based Spatial Ontology for Semantic Querying of 3D Property Information
With the growing dominance of complex and multi-level urban structures, current cadastral systems, which are often developed based on 2D representations, are not capable of providing unambiguous spatial information about urban properties. Therefore, the concept of 3D cadastre is proposed to support 3D digital representation of land and properties and facilitate the communication of legal owners...
متن کاملDeveloping an Integrated Simulation Model of Bayesian-networks to Estimate the Completion Cost of a Project under Risk: Case Study on Phase 13 of South Pars Gas Field Development Projects
Objective: The aim of this paper is to propose a new approach to assess the aggregated impact of risks on the completion cost of a construction project. Such an aggregated impact includes the main impacts of risks as well as the impacts of interactions caused by dependencies among them. Methods: In this study, Monte Carlo simulation and Bayesian Networks methods are combined to present a frame...
متن کاملThe Compiler Forest
Compilers targeting complex execution environments, such as computer clusters composed of machines with multi-core CPUs and GPUs, are difficult to write. To address this problem, we introduce partial compilers, which can pass subtasks to child compilers and combine the various plans they create, as a generalization of traditional compilers. We define a set of high-level polymorphic operations t...
متن کاملA mathematical model for sustainable probabilistic network design problem with construction scheduling considering social and environmental issues
Recent facility location allocation problems are engaged with social, environmental and many other aspects, besides cost objectives.Obtaining a sustainable solution for such problems requires development of new mathematical modeling and optimization algorithms. In this paper, an uncapacitated dynamic facility location-network design problem with random budget constraints is considered. Social i...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2006