Building Query Compilers ( Under Construction ) [ expected time to completion : 5 years ]

نویسنده

  • Guido Moerkotte
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Nuts and Bolts of DBMS Construction: Building your Own Prototype

DBMS construction: DBMS construction: DBMS construction: DBMS construction: DBMS construction: DBMS construction: building your own prototype building your own prototype building your own prototype building your own prototype building your own prototype building your own prototype building your own prototype building your own prototype 2 3 Motivation • www.amazon.com: – 48 books on compiler con...

متن کامل

Developing a BIM-based Spatial Ontology for Semantic Querying of 3D Property Information

With the growing dominance of complex and multi-level urban structures, current cadastral systems, which are often developed based on 2D representations, are not capable of providing unambiguous spatial information about urban properties. Therefore, the concept of 3D cadastre is proposed to support 3D digital representation of land and properties and facilitate the communication of legal owners...

متن کامل

Developing an Integrated Simulation Model of Bayesian-networks to Estimate the Completion Cost of a Project under Risk: Case Study on Phase 13 of South Pars Gas Field Development Projects

Objective: The aim of this paper is to propose a new approach to assess the aggregated impact of risks on the completion cost of a construction project. Such an aggregated impact includes the main impacts of risks as well as the impacts of interactions caused by dependencies among them. Methods: In this study, Monte Carlo simulation and Bayesian Networks methods are combined to present a frame...

متن کامل

The Compiler Forest

Compilers targeting complex execution environments, such as computer clusters composed of machines with multi-core CPUs and GPUs, are difficult to write. To address this problem, we introduce partial compilers, which can pass subtasks to child compilers and combine the various plans they create, as a generalization of traditional compilers. We define a set of high-level polymorphic operations t...

متن کامل

A mathematical model for sustainable probabilistic network design problem with construction scheduling considering social and environmental issues

Recent facility location allocation problems are engaged with social, environmental and many other aspects, besides cost objectives.Obtaining a sustainable solution for such problems requires development of new mathematical modeling and optimization algorithms. In this paper, an uncapacitated dynamic facility location-network design problem with random budget constraints is considered. Social i...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006