The Sequence of Action Model: Leveraging the Sequence of Attempts and Hints
نویسندگان
چکیده
Intelligent Tutoring Systems (ITS) have been proven to be efficient providing student assistance and assessing their performance when they do their homework. Researchers have analyzed how students’ knowledge grows and predict their performance from within intelligent tutoring systems. Most of them focus on using correctness of the previous question or the number of hints and attempts students need to predict their future performance, but ignore the sequence of hints and attempts. In this research work, we build a Sequence of Actions (SOA) model taking advantage of the sequence of hints and attempts a student needed for the previous question to predict students’ performance. A two step modeling methodology is put forward in the work and is a combination of Tabling method and the Logistic Regression. We compared SOA with Knowledge Tracing (KT) and Assistance Model (AM) and combinations of SOA/AM and KT. The experimental results showed that the Sequence of Action model has reliably better predictive accuracy than KT and AM and its performance of prediction is improved after combining with KT.
منابع مشابه
A prediction model that uses the sequence of attempts and hints to better predict knowledge: "Better to attempt the problem first, rather than ask for a hint"
Intelligent Tutoring Systems (ITS) have been proven to be efficient in providing students assistance and assessing their performance when they do their homework. Many research projects have been done to analyze how students’ knowledge grows and to predict their performance from within intelligent tutoring system. Most of them focus on using correctness of the previous question or the number of ...
متن کاملA Mathematical Model for Cell Formation in CMS Using Sequence Data
Cell formation problem in Cellular Manufacturing System (CMS) design has derived the attention of researchers for more than three decades. However, use of sequence data for cell formation has been the least investigated area. Sequence data provides valuable information about the flow patterns of various jobs in a manufacturing system. This paper presents a new mathematical model to solve a cell...
متن کاملA fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates
This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...
متن کاملMulti-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints
This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...
متن کاملA two-stage stochastic rule-based model to determine pre-assembly buffer content
This study considers instant decision-making needs of the automobile manufactures for resequencing vehicles before final assembly (FA). We propose a rule-based two-stage stochastic model to determine the number of spare vehicles that should be kept in the pre-assembly buffer to restore the altered sequence due to paint defects and upstream department constraints. First stage of the model decide...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2014