A Mathematical Model for Scheduling a Batch Processing Machine with Multiple Incompatible Job Families, Non-identical Job dimensions, Non- identical Job sizes, Non-agreeable release times and due dates

نویسندگان

  • M. Ramasubramaniam
  • M. Mathirajan
چکیده

The paper addresses the problem scheduling a batch processing machine with multiple incompatible job families, non-identical job dimensions, non-identical job sizes and non-agreeable release dates to minimize makespan. The research problem is solved by proposing a mixed integer programming model that appropriately takes into account the parameters considered in the problem. The proposed is validated using a numerical example. The experiment conducted show that the model can pose significant difficulties in solving the large scale instances. The paper concludes by giving the scope for future work and some alternative approaches one can use for solving these class of problems.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Efficient Bi-objective Genetic Algorithm for the Single Batch-Processing Machine Scheduling Problem with Sequence Dependent Family Setup Time and Non-identical Job Sizes

This paper considers the problem of minimizing make-span and maximum tardiness simultaneously for scheduling jobs under non-identical job sizes, dynamic job arrivals, incompatible job families,and sequence-dependentfamily setup time on the single batch- processor, where split size of jobs is allowed between batches. At first, a new Mixed Integer Linear Programming (MILP) model is proposed for t...

متن کامل

Virtual manufacturing cells scheduling considering lotstreaming and sequence dependent setup times

In this paper, a new mathematical model for the problem of job scheduling in virtual manufacturing cells (VMC) is presented to minimizing the completion time of all jobs. Sequence dependent setup times of machines is considered and lot-streaming is possible. In Virtual manufacturing cells, each job has a different processing path and there is a set of machines for processing each operation. The...

متن کامل

Earliness-tardiness minimization on scheduling a batch processing machine with non-identical job sizes

This paper considers a scheduling problem for minimizing the sum of the absolute deviations of completion times from the due dates of all jobs (earliness-tardiness) on a single batch processing machine. For this problem, each job has a corresponding processing time and size and all jobs have the common due date. The problem under study is NP-hard and hence a hybrid genetic algorithm based on a ...

متن کامل

The bounded single-machine parallel-batching scheduling problem with family jobs and release dates to minimize makespan

We consider the problem of scheduling family jobs with release dates on a bounded batching machine. Our objective is to minimize the maximum completion time of the jobs (i.e., the makespan). We deal with two variants of the problem. One is the identical job size model, in which the machine can process up to b jobs simultaneously as a batch. The other is the non-identical job size model, in whic...

متن کامل

Minimizing the makespan on a batch machine with non-identical job sizes: an exact procedure

A batch processing machine can simultaneously process several jobs forming a batch. This paper considers the problem of scheduling jobs with non-identical capacity requirements, on a single-batch processing machine of a given capacity, to minimize the makespan. The processing time of a batch is equal to the largest processing time of any job in the batch. We present some dominance properties fo...