Achieving Optimal Cycle Time Improvement in a 300-mm Semiconductor Fab Using Dynamic Simulation and Design of Experiments

نویسندگان

  • Dominique Mercier
  • Olivier Bonnin
  • Philippe Vialletelle
چکیده

Advanced 300-mm ASIC/SOC (application-specific integrated circuit/system on a chip) fabrication plants with multiproduct and multiprocess models will require both a high level of flexibility and efficiency to achieve cost-effective manufacturing cycle times. Today, potential solutions to achieve breakthrough manufacturing cycle times are under consideration. Given the dynamic nature of all of the manufacturing phenomena involved in chip fabrication, the increasing manufacturing complexity level, and the huge investment required, the industry has turned to dynamic simulation as the standard tool to use when attempting to provide an accurate analysis of the impact of each strategic or tactical decision being made in the fabrication plant. A design of experiments based on dynamic simulation, using real production equipment performances as input, is the basis of these experiments. This model allows testing of various manufacturing scenarios and measuring their impact on manufacturing cycle time.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Chia - Nan Wang Modularized simulation for lot delivery time forecast in automatic material handling systems of 300 mm semiconductor manufacturing

The more accurate the forecast is to lot delivery time, the more effective it is in fab scheduling. In fab operations, scheduling is the major impact factor of tools capacity allocation, tools utilization control and bottleneck management. However, there is no effective method to estimate delivery time in 300 mm automatic material handling systems (AMHS) operation. Computer simulations are auth...

متن کامل

High-®delity Rapid Prototyping of 300 Mm Fabs through Discrete Event System Modeling

Traditionally, the semiconductor manufacturing industry has been driven by continuous technological advancement of the underlying production processes. Yet, as the industry matures, mere technology development is no longer suf®cient. The effective deployment and exploitation of the system production capacity and operational capability become critical for competitive success. Hence, currently, t...

متن کامل

Toward on-demand wafer fab simulation using formal structure & behavior models

Contemporary factories in capital intensive industries such as semiconductor manufacturing are very complex, with many sources of risk. The highly competitive and global business environment forces companies to analyze, design, and continuously re-design factories with distributed multidisciplinary teams. Traditional factory design approaches using spreadsheets and stand-alone simulations canno...

متن کامل

Sensitivity Analysis of Water Flooding Optimization by Dynamic Optimization

This study concerns the scope to improve water flooding in heterogeneous reservoirs. We used an existing, in-house developed, optimization program consisting of a reservoir simulator in combination with an adjoint-based optimal control algorithm. In particular we aimed to examine the scope for optimization in a two-dimensional horizontal reservoir containing a single high permeable streak, ...

متن کامل

Application of Cluster Tool Modeling to a 300 Mm Fab Simulation

300 mm semiconductor wafer fabrication facilities, like conventional semiconductor fabs, contain many different types of tools. In this paper we discuss a realistic way of representing cluster tools in a simulation model of the entire line. A more realistic representation of cluster tools results in greater accuracy in the output of the simulation model.

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Simulation

دوره 79  شماره 

صفحات  -

تاریخ انتشار 2003