OBJECTIVES The objective of this study was to investigate the effect of chain installation condition on stress distribution that could eventually cause disastrous failure from sudden deformation and geometric rupture. METHODS Fractographic method used for the failed chain indicates that over-stress was considered as the root cause of failure. 3D modeling and finite element analysis for the chain, used in a crane hook, were performed with a three-dimensional interactive application program, CATIA, commercial finite element analysis and computational fluid dynamic software, ANSYS. RESULTS The results showed that the state of stress was changed depending on the initial position of the chain that was installed in the hook. Especially, the magnitude of the stress was strongly affected by the bending forces, which are 2.5 times greater (under the simulation condition currently investigated) than that from the plain tensile load. Also, it was noted that the change of load state is strongly related to the failure of parts. The chain can hold an ultimate load of about 8 tons with only the tensile load acting on it. CONCLUSION The conclusions of this research clearly showed that a reduction of the loss from similar incidents can be achieved when an operator properly handles the installation of the chain.
منابع مشابه
Prioritizing Potential Risks based on Failure Mode and Effects Analysis Using Data Envelopment Analysis: a case study
The need to establish power plants to supply the required electricity of the country has been rising due to increasing demand levels as well as the lack of governmental resources. Furthermore, the available traditional attitude in performing and conducting power plant projects has made government seek a modern attitude. This paper tries to use the topics that have been employed in automotive in...
متن کاملNumerical study on the behavior of link-to-column connections in eccentrically braced frames
Geometry of eccentrically braced frames (EBFs) in some cases causes the connection of link beam to the column. The details of such conditions should be studied carefully due to the full plastic rotation in the link beam. In this research, the behavior of link-to-column connection is modeled and the failure modes are considered. Based on the previous researches shear link can exhibit better beha...
متن کاملApplication of Failure Mode Effect Analysis (FMEA) for Efficient and Cost-effective Manufacturing: A Case Study at Bahir Dar Textile Share Company, Ethiopia
The aim of this paper is to show the application of Failure Mode Effect Analysis (FMEA) for efficient and cost-effective manufacturing. Companies need better economic gains from enhanced production, but downtime affects this paradigm. Bair Dar Textile Share Company (BDTSC) is no exception. The looming section of the case company faces on average 38.69% of downtime from the total production time...
متن کاملProbabilistic analysis of stability of chain pillars in Tabas coal mine in Iran using Monte Carlo simulation
Performing a probabilistic study rather than a determinist one is a relatively easy way to quantify the uncertainty in an engineering design. Due to the complexity and poor accuracy of the statistical moment methods, the Monte Carlo simulation (MCS) method is wildly used in an engineering design. In this work, an MCS-based reliability analysis was carried out for the stability of the chain pill...
متن کاملShear-Flexural Interaction in Analysis of Reduced Web Section Beams using VM Link Element
Reduced web section beams in shear-yielding moment-resistant steel frames are used for energy dissipating of earthquakes. The finite element analysis indicates that failure mode of these beams are governed by the combination of shear force and flexural moment. Therefore the analysis of frames with reduced web section beams needs consideration of shear-flexural interaction in those sections. In ...
متن کاملSupply Chain Performance Evaluation Using Data Envelopment Analysis (A case study of tile industry)
The competition increscent urgency in the global economy causes many organizations focus more on novel management ideas in constructing, delivery services and their productions. In current conditions, supply chain and the importance of a suitable performance evaluating system in order to understand the current condition and program for its improvement, has a very special importance in creating ...