Commissioning Experience with the PEP-II Low-Level RF System*
نویسندگان
چکیده
The low-level RF system for PEP-II is a modular design housed in a VXI environment and supported by EPICS. All signal processing and control is done at baseband using in-phase and quadrature (IQ) techniques. Remotely configurable RF feedback loops are used to control coupled-bunch instabilities driven by the accelerating mode of the RF cavities. A programmable DSP based feedback loop is implemented to control phase variations across the klystron due to the required adjustment of the cathode voltage to limit cathode power dissipation. The DSP loop also adaptively cancels modulations caused by klystron power supply ripple at selected power line harmonics between 60 Hz and 10 kHz. The system contains a built-in baseband network analyzer which allows remote measurement of the RF feedback loop transfer functions and automated configuration of these loops. This paper presents observations and measured data from the system.
منابع مشابه
Architecture and Performance of the PEP-II Low-Level RF System*
Heavy beam loading in the PEP-II B Factory along with large ring circumferences places unique requirements upon the low-level RF (LLRF) system. RF feedback loops must reduce the impedance observed by the beam while ignoring the cavity transients caused by the ion clearing gap. Special attention must be placed on the cavity tuner loops to allow matching the ion clearing gap transients in the hig...
متن کاملCommissioning of the PEP-II High Power RF Systems
We describe the commissioning of the high-power RF stations for the PEP-II B factory. This includes in-situ testing and conditioning of components after installation, phasing of cavities within each station and between stations in each ring, capture of fist beam, stored-beam operation at lowand moderatecurrent, commissioning of feedback loops, and high-current operation. Performance of the over...
متن کاملCommissioning Experience from PEP-II HER Longitudinal Feedback
The DSP-based bunch-by-bunch feedback system installed in the PEPII high-energy ring (HER) has been used to damp instabilities induced by unwanted higher-order modes (HOMs) at beam currents up to 605 mA during commissioning. Beam pseudospectra calculated from feedback system data indicate the presence of coupled-bunch modes that coincide with a previously observed cavity mode (0-M-2). Bunch cur...
متن کاملLessons learned from positron - electron project low level rf and longitudinal feedback
The Positron-Electron Project II (PEP-II) B Factory collider ended the final phase of operation at nearly twice the design current and 4X the design luminosity. In the ultimate operation state, eight 1.2 MW radiofrequency (rf ) klystrons and 12 accelerating cavities were added beyond the original implementation, and the two storage rings were operating with longitudinal instability growth rates...
متن کاملModeling and Simulation of the Longitudinal Beam Dynamics - Rf Station Interaction in the Lhc Rings
A non-linear time-domain simulation has been developed to study the interaction between longitudinal beam dynamics and RF stations in the LHC rings. The motivation for this tool is to determine optimal LLRF configurations, to study system sensitivity on various parameters, and to define the operational and technology limits. It will be also used to study the effect of RF station noise, impedanc...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 1997