Commissioning of Kekb Bunch Feedback Systems
نویسنده
چکیده
Commissioning of KEKB started at the end of the last year. In the early stages of the commissioning, we observed transverse instabilities in both rings and started tuning of the bunch feedback systems. Even though the tuning is now at the initial stage, the feedback systems are contributing to an increase of the maximum storable currents in the KEKB rings. Feedback-related systems, tune meters and bunchcurrent monitors, are also working well.
منابع مشابه
Beam Diagnostics Using Bunch-by-bunch Feedback Systems in the Kekb Rings
Transverse bunch-by-bunch feedback systems for damping coupled-bunch instabilities in the KEKB rings have been working well since the early stages of the commissioning of the rings. Beam diagnostic systems that are the part of the bunch feedback systems, such as bunch current monitors, betatron-tune measurements systems, and bunch oscillation recorders, have been playing important roles in the ...
متن کاملBunch by Bunch Feedback Systems for the Kekb Rings
Transverse bunch-by-bunch feedback systems for damping coupled-bunch instabilities in the KEKB rings have been working since the early stage of the commissioning of the rings. Stabilization of the beams with the system have been successful, permitting tests of higher beam currents and various filling patterns. The performance of these systems has been demonstrated under the normal physics run p...
متن کاملBunch-by-bunch Feedback Systems for Kekb Rings
Bunch-by-bunch feedback systems for curing coupled-bunch instabilities in the KEKB rings have been constructed. Even at a very early stage of the commissioning of the rings, strong transverse instabilities occurred in both rings which limited maximum storable currents. Stabilization of the beams with transverse feedback systems has been successful so far, enabling us to accumulate greater beam ...
متن کاملKEKB Beam Instrumentation Systems
For the stable high-luminosity operation and luminosity-increase, the electron and positron storage rings of the KEK B-Factory (KEKB) is equipped with various beam instrumentations, which have being working well since the start of the commissioning in December, 1998. Details and performance of the beam-position monitor system based on the spectrum analysis using DSPs, the turn by turn BPM with ...
متن کاملRecent Progress in the Development of the Bunch Feedback Systems for Kekb
In KEKB, which is a B-factory project at KEK, the bunch spacing is very short, only 2 ns, and the number of the bunches comes up to about 5000 per ring. In order to cure the instabilities due to the high beam current, we will use bunch feedback systems in KEKB rings. Recently we developed the new position detection system and made a prototype of the signal process system for the feedback system...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 1999