A qualitative re-construction of project measurement criteria

نویسندگان

  • Udechukwu Ojiako
  • Eric Johansen
  • David Greenwood
چکیده

Purpose – Failure is encountered regularly within project-based industries and there has been research for decades into this phenomenon. Much of it has considered the failure of projects in terms of the classic project progress issues such as time, cost and quality. Using cases from two major industries the authors aim to develop a different understanding of project measurement criteria. This work is part of a larger completed investigation into information systems and information technology (IS/IT) project management models, developed for industry comparisons. Design/methodology/approach – During the study, the concept of project failure and success is investigated. The authors carry out a UK-based, grounded study of two project-based industries of differing maturity levels (construction and IS/IT) to investigate measures of project failure or success across the two industries. Findings – The paper presents a reassessment of project measurement criteria. This is based on the separation of measures for project performance and project progress. Research limitations/implications – The adopted strategy of naturalistic inquiry has always been susceptible to the criticism that it relies too much on subjective interpretation of data. In addition, no clear relationship was established between the factors discussed and the criteria for measuring project success. Originality/value – The paper discusses current differences in perception of what actually constitutes a failed or successful project. The paper highlights that often two different (but closely related) concepts, are being discussed by project stakeholders.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Design and construction of 6-component balance dynamometer for measurement of the forces, moments andmotions of ship models in the towing tank

During design spiral of a merchant ship or a naval vessel, it is important to perform towing tank tests in order to measure its performance either in calm water maneuvers or in waves for seakeeping performance. Also, to optimize a hydrodynamic design, towing tank tests are advantageous.This article presents the results of an applied research project. The objective of this project is to design a...

متن کامل

An integrated simulation-DEA approach to multi-criteria ranking of scenarios for execution of operations in a construction project

The purpose of this study is to examine different scenarios for implementing operations in the pre-construction phase of a project, based on several competing criteria with different importance levels in order to achieve a more efficient execution plan. This paper presents a new framework that integrates discrete event simulation (DES) and data envelopment analysis (DEA) to rank different scena...

متن کامل

Evaluating Construction Projects by a New Group Decision-Making Model Based on Intuitionistic Fuzzy Logic Concepts

Select an appropriate project is a main key for contractors to increase their profits. In practice, in this area the uncertainty and imprecise of the involved parameters is so high. Therefore, considering fuzzy sets theory to deal with uncertainly is more appreciate. The aim of this paper is present a multi-criteria group decision-making model under an intuitionistic fuzzy set environment. Henc...

متن کامل

Determining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)

Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...

متن کامل

Developing a conceptual model based upon the Latin Hypercube Sampling for integrating OHS into project risk evaluation

Abstract Project management in construction industry, in many cases, is imperfect with respect to the integration of Occupational Health and Safety (OHS) risks. This imperfection exhibits itself as complications affecting the riskiness of industrial procedures and is illustrated usually by poor awareness of OHS within project teams. Difficulties on OHS regularly came about in the construction i...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Industrial Management and Data Systems

دوره 108  شماره 

صفحات  -

تاریخ انتشار 2008