MEOSAR Cost Escalation Risk
ثبت نشده
چکیده
On 10 February 2014, Senior Cost Analyst, Peter Iburg, CMA, of Directorate of Costing Services, (D Cost S), requested DRDC CORA’s assistance with determining the cost escalation risk for the Medium Earth Orbit Search and Rescue (MEOSAR) project. Following a project meeting on 12 February 2014, Mr. Iburg provided us with subject matter expert(s) (SME) cost escalation data on 21 February 2014 in the form of three point estimates (low-expected-high) with confidence levels on 62 MEOSAR budget line items. Mr. Iburg asked that we determine the median and 85th percentile on the total cost of the project, the cost of the definition phase, and the cost of the implementation phase, using SME inputs.
منابع مشابه
Study of Ionospheric Effects on Azimuth Imaging for Medium-earth-orbit Sar
The Medium-Earth-Orbit SAR (MEOSAR) is one of the most potential next-generation spaceborne SARs for its excellent performances. However, the MEOSAR may not be able to produce data useful for science applications due to ionospheric effects. So it is very necessary to study ionospheric effects for the development of MEOSAR. In this paper, we present ionospheric effects on azimuth imaging for MEO...
متن کاملOptimising Cost and Safety by Appropriate Use of European Norms
It has been found that risk analyses carried out in accordance with the European Standards and reflecting the specific detail of each application has led to a great escalation of cost of safety approval. Producing a separate risk analysis for each installation in a country increases the costs without discernable benefit. There is scope for making substantial cost reduction through new approache...
متن کاملCost analysis of a coal-fired power plant using the NPV method
The present study investigates the impact of various factors affecting coal-fired power plant economics of 210 MW subcritical unit situated in north India for electricity generation. In this paper, the cost data of various units of thermal power plant in terms of power output capacity have been fitted using power law with the help of the data collected from a literature search. To have a realis...
متن کاملStudy on Commitment Escalation Based on the Self-esteem Level of Decision-makers and the Sunk Cost of a Program
The phenomenon of "commitment escalation" originated from decision makers, and is part never encountered by traditional risk control theory. The phenomenon of commitment escalation frequently occurs in decision making of an enterprise, which seriously affects cultural establishment and training of core competition of the enterprise. In order to search for explanatory variables of "commitment es...
متن کاملDeterminants of escalating costs in low risk workers' compensation claims.
OBJECTIVE To identify and quantify attributes that lead to unanticipated cost escalation in workers' compensation claims. METHODS We constructed four claim categories: low initial reserve/low cost, migrated catastrophic (low initial reserve/high cost), high initial reserve/low cost, and catastrophic (high initial reserve/high cost). To assess the attributes associated with the increased cost ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2014