Workflow Re-engineering for Implementing a 4D Construction Management Tool in a Design-Build Project

نویسندگان

  • Meng-Han Tsai
  • Abdul Matin
  • Shih-Chung Kang
  • Shang-Hsien Hsieh
چکیده

The use of 4D management tool in construction industry has been growing rapidly in recent years in response to soaring demands on efficient construction management. Successful implementation of this tool in an engineering firm for use in real projects is still challenging. This paper shares the experience on implementing an in-house 4D management tool in a large EPC (Engineering, Procurement and Construction) firm that has extended reputation on design-build projects. A new workflow was proposed that takes full advantage of the 4D tool to enhance construction management performance and minimizes impacts on the firm's existing workflow. The workflow development for the firm to implement 4D management tool in real project was done by interviewing key personnel in multiple departments of the firm and by carefully examining probable impacts of the 4D tool's introduction into the firm's business processes.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Workflow Tool for Engineers in a Grid-Enabled Matlab Environment

The Geodise Project aims to aid engineers in the design process by making available a suite of design search and optimisation tools and Computational Fluid Dynamics (CFD) analysis packages integrated with distributed Grid-enabled computing, databases and knowledge management technologies. Engineering Design Search and Optimisation (EDSO) is a long and repetitive process requiring a complex sequ...

متن کامل

Comparative analysis of design/build and design/bid/build project delivery systems in Lebanon

Design/bid/build and design/build are two principal project delivery systems used worldwide. The performance of each project may differ with the type of procurement system used. This study has two aims: firstly, to assess and compare the performance of design/bid/build and design/build projects in Lebanon; secondly, to compare the results with the performance of equivalent systems in the Far Ea...

متن کامل

Construction schedule review in GIS with a navigable 3D animation of project activities

This paper presents a Geographic Information Systems (GIS) based navigable 3D animation of project activities to visualise and review a construction project schedule as an alternative to the existing 4D CAD tools. Most of the commercial tools allow planners to build a 4D model but lack features like generation and manipulation of developed 4D model on a single platform. To facilitate the 4D mod...

متن کامل

4D Simulation and Construction Planning

Students will learn how to use a workflow combining models created with the Autodesk® Revit platform with the Autodesk Navisworks® TimeLiner tool to create 4D simulations of planned construction processes. They will explore modeling techniques for creating better and more accurate simulations, as well as the importance of modeling building elements to reflect planned construction techniques. Th...

متن کامل

4D Simulation and Construction Planning

Students will learn how to use a workflow combining models created with the Autodesk® Revit platform with the Autodesk Navisworks® TimeLiner tool to create 4D simulations of planned construction processes. They will explore modeling techniques for creating better and more accurate simulations, as well as the importance of modeling building elements to reflect planned construction techniques. Th...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2009