Scheduling for Parallel Dedicated Machines with a Single Server
نویسندگان
چکیده
This paper examines scheduling problems in which the setup phase of each operation needs to be attended by a single server, common for all jobs and different from the processing machines. The objective in each situation is to minimize the makespan. For the processing system consisting of two parallel dedicated machines we prove that the problem of finding an optimal schedule isNP -hard in the strong sense even if all setup times are equal or if all processing times are equal. For the case of m parallel dedicated machines, a simple greedy algorithm is shown to create a schedule with the makespan that is at most twice the optimum value. For the two machine case, an improved heuristic guarantees a tight worst-case ratio of 3/2. We also describe several polynomially solvable cases of the later problem. The two-machine flow shop and the open shop problems with a single server are also shown to be NP -hard in the strong sense. However, we reduce the two-machine flow shop no-wait problem with a single server to the Gilmore–Gomory traveling salesman problem and solve it in polynomial time. c © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 304–328, 2000
منابع مشابه
Solving the Problem of Scheduling Unrelated Parallel Machines with Limited Access to Jobs
Nowadays, by successful application of on time production concept in other concepts like production management and storage, the need to complete the processing of jobs in their delivery time is considered a key issue in industrial environments. Unrelated parallel machines scheduling is a general mood of classic problems of parallel machines. In some of the applications of unrelated parallel mac...
متن کاملSolving the Problem of Scheduling Unrelated Parallel Machines with Limited Access to Jobs
Nowadays, by successful application of on time production concept in other concepts like production management and storage, the need to complete the processing of jobs in their delivery time is considered a key issue in industrial environments. Unrelated parallel machines scheduling is a general mood of classic problems of parallel machines. In some of the applications of unrelated parallel mac...
متن کاملMulti-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints
This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...
متن کاملParallel Jobs Scheduling with a Specific Due Date: Asemi-definite Relaxation-based Algorithm
This paper considers a different version of the parallel machines scheduling problem in which the parallel jobs simultaneously requirea pre-specifiedjob-dependent number of machines when being processed.This relaxation departs from one of the classic scheduling assumptions. While the analytical conditions can be easily statedfor some simple models, a graph model approach is required when confli...
متن کاملFinite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups
This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....
متن کامل