The commissioning of the Swiss Light Source (SLS) started in Feb. 2000 with the Linac, continued in May 2000 with the booster synchrotron and by Dec. 2000 first light in the storage ring were produced. The first four beam lines had to be operational by August 2001. The thorough integration of all subsystems to the control system and a high level of automation was prerequisite to meet the tight time schedule. A careful balanced distribution of functionality into high level and low level applications allowed an optimization of short development cycles and high reliability of the applications. High level applications were implemented as CORBA based client/server applications (tcl/tk and Java based clients, C++ based servers), IDL applications using EZCA, medm/dm2k screens and tcl/tk applications using CDEV. Low level applications were mainly built as EPICS process databases, SNL state machines and customized drivers. Functionality of the high level application was encapsulated and pushed to lower levels whenever it has proven to be adequate. That enabled to reduce machine setups to a handful of physical parameters and allow the usage of standard EPICS tools for display, archiving and processing of complex physical values. High reliability and reproducibility were achieved with that approach.
منابع مشابه
System Integration of High Level Applications during the Commissioning of the Swiss Light Source
The commissioning of the Swiss Light Source (SLS) started in Feb. 2000 with the Linac, continued in May 2000 with the booster synchrotron and by Dec. 2000 first light in the storage ring were produced. The first four beam lines had to be operational by August 2001. The thorough integration of all subsystems to the control system and a high level of automation was prerequisite to meet the tight ...
متن کاملCommissioning of the Swiss Light Source
The Swiss Light Source (SLS) at the Paul Scherrer Institute (PSI) consists of a turn key 100 MeV linac, a novel type of booster synchrotron and a 12-TBA storage ring providing 5 nm·rad natural emittance at 2.4 GeV. The SLS project was approved by Swiss Government in Sept. 1997. By June 1999 the building was finished. Linac and booster commissioning concluded by April, resp. Sept. 2000. First be...
متن کاملApplication of Digital Regulated Power Supplies for Magnet Control at the Swiss Light Source
The Swiss Light Source (SLS) has in the order of 500 magnet power supplies (PS) installed, ranging from from 3A/20V four-quadrant PS to a 950A/1000V two-quadrant 3 Hz PS. All magnet PS have a local digital controller for a digital regulation loop and a 5 MHz optical point-to-point link to the VME1 level. The PS controller is running a pulse width/pulse repetition regulation scheme, optional wit...
متن کاملApplication of digital regulated Power Supplies for Magnet Control at the Swiss Light Source
The Swiss Light Source (SLS) has in the order of 500 magnet power supplies (PS) installed, ranging from from 3 A/20 V four-quadrant PS to a 950 A/1000 V two-quadrant 3 Hz PS. All magnet PS have a local digital controller for a digital regulation loop and a 5 MHz optical point-to-point link to the VME1 level. The PS controller is running a pulse width/pulse repetition regulation scheme, optional...
متن کاملCommissioning of the 100 MeV Swiss Light Source Injector Linac
The 100 MeV injector for the Swiss Light Source, designed and delivered as turnkey system by ACCEL Instruments, was commissioned in April 2000 [1]. A description of the system consisting of electron source, buncher section, accelerating structures, rf power plant and control system will be given. Specified and measured beam parameters will be compared to show the performance of the entire system.
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- CoRR
دوره cs.SE/0111021 شماره
صفحات -
تاریخ انتشار 2001