Mrp-jit Integrated Production System

نویسنده

  • Vaibhav Jha
چکیده

A combined MRP(material requirement planning) and JIT(just in time) system can be more effective manufacturing system which utilizes the best attributes of each manufacturing system need to accommodate the best planning features of MRP and the best execution features of JIT to address the changing needs of industry. When MRP and JIT involve in any production system than its balance the all entire production and also minimize their limitation by work

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Manufacturing planning and control technology versus operational performance: an empirical study of MRP and JIT in China

Materials Requirements Planning (MRP) and Just-in-Time (JIT) are currently two of the most popular manufacturing technologies. Based on 246 Chinese companies’ survey, we found that the degree of the MRP and JIT implementation and integration has a positive relationship with the manufacturer’s performance. The hybrid MRP and JIT system, which create synergy and attains better performance, is wid...

متن کامل

Focusing material requirements planning (MRP) towards performance

This paper looks at the successes and disappointments of MRP. It studies numerous articles to determine what the key shortcomings of MRP are. Next, it investigates if these failures are correctable, and what the consequences of not correcting these de®ciencies means. This article considers alternatives that have been discussed in the current literature. Last of all this article discusses whethe...

متن کامل

Enhancing Basic Metal Industry Global Competitiveness Through Total Quality Management, Supply Chain Management & Just- In -Time

The selection and implantation of sufficient and appropriate continuous improvement strategy are the key success factors for improving firm performance and enhancement of competitive advantage on manufacturing industries. As a result special role are given to Continuous improvement programs such as Supply Chain Management (SCM), Six-Sigma, Total Quality Management (TQM), Kaizen, Just-in-Time (J...

متن کامل

A Comparative Study of Existing Manufacturing Planing and Control Approaches

During the 1980s various approaches to batch-type manufacturing environments were implemented. The most popular of these were MaterialRequirements Planning (MRP), ('JfOUP Technology (GT) and Just-In-Time (JIT). However few successful implementations of any of these approaches were achieved [1] [2] [3]. This paper compares the various approaches of GT, MRP, TIT along with the integrated approach...

متن کامل

Simulation of a Two Cards JIT Production System

This paper presents a summary of the results from the simulation of a given two-stages production system which uses JIT. The system consists of an assembly line with two automated assembly cells and two assembly stock points and one manufacturing cell with three manufacturing stock points for storing reserved parts and one receiving stock. Carts with fixed capacity are used for handling the par...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012