Logic-algebraic method based and constraints programming driven approach to AGVs scheduling
نویسندگان
چکیده
The subject matter of the study is the automated guided vehicle (AGV) operation synchronisation mechanisms in flexible manufacturing systems. The processes examination has to guarantee the collision-free and deadlock-free AGVs flow. The problem of determination of the rules coordinating access of the vehicles to the shared travel route intervals, ensuring the collision-free and deadlock-free execution of the repetitive processes was reduced to determination of the sufficient conditions of the form of a pair (initial state, a set of priority rules). In particular the problem of searching for a pair is defined in the form of the constraint satisfaction problem (CSP) and is solved with use of the logic programming techniques. The inference engine applied in the LAM is then easily implemented in a kind of constraint logic programming language. Proposed approach provides the framework allowing one to take into account both distinct, and imprecise data, in a unified way.
منابع مشابه
Scheduling and routing of automated guided vehicles: A hybrid approach
We propose a hybrid method designed to solve a problem of dispatching and conflict free routing of automated guided vehicles (AGVs) in a flexible manufacturing system (FMS). This problem consists in the simultaneous assignment, scheduling and conflict free routing of the vehicles. Our approach consists in a decomposition method where the master problem (scheduling) is modelled with constraint p...
متن کاملThe preemptive resource-constrained project scheduling problem subject to due dates and preemption penalties: An integer programming approach
Extensive research has been devoted to resource constrained project scheduling problem. However, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. In this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...
متن کاملMathematical Modeling for a Flexible Manufacturing Scheduling Problem in an Intelligent Transportation System
This paper presents a new mathematical model for a production system through a scheduling problem considering a material handling system as an intelligent transportation system by automated guided vehicles (AGVs). The traditional systems cannot respond to the changes and customer’s demands and for this reason, a flexible production system is used. Therefore, for this purpose, automated transpor...
متن کاملElectricity Procurement for Large Consumers with Second Order Stochastic Dominance Constraints
This paper presents a decision making approach for mid-term scheduling of large industrial consumers based on the recently introduced class of Stochastic Dominance (SD)- constrained stochastic programming. In this study, the electricity price in the pool as well as the rate of availability (unavailability) of the generating unit (forced outage rate) is considered as uncertain parameters. Th...
متن کاملNurse rostering using fuzzy logic: A case study
In this paper, we used the fuzzy set theory for modeling flexible constraints and uncertain data in nurse scheduling problems and proposed a fuzzy linear model for nurse rostering problems. The developed model can produce rosters that satisfy hospital objectives, ward requirements and staff preferences by satisfying their requests as much as possible. Fuzzy sets are used for modeling demands of...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- IJIIDS
دوره 3 شماره
صفحات -
تاریخ انتشار 2009