Solving the flight gate assignment problem using dynamic programming

نویسندگان

  • Florian Jaehn
  • F. Jaehn
چکیده

This paper considers the problem of assigning flights to airport gates—a problem which is NP-hard in general. We focus on a special case in which the maximization of flight/gate preference scores is the only objective. We show that for a variable number of flights and gates, this problem is still NP-hard. For a fixed number of gates, we present a dynamic programming approach that solves the flight assignment problem in linear time with respect to the number of flights. Computational results using real life data from a major European airport prove the practical relevance of this approach.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Benders’ decomposition algorithm to solve bi-level bi-objective scheduling of aircrafts and gate assignment under uncertainty

Management and scheduling of flights and assignment of gates to aircraft play a significant role to improve the performance of the airport, due to the growing number of flights and decreasing the flight times. This research addresses the assignement and scheduling problem of runways and gates simultaneously. Moreover, this research is the first study that considers the constraint of unavailabil...

متن کامل

Solving a Two-Period Cooperative Advertising Problem Using Dynamic Programming

Cooperative advertising is a cost-sharing mechanism in which a part of retailers' advertising investments are financed by the manufacturers. In recent years, investment among advertising options has become a difficult marketing issue. In this paper, the cooperative advertising problem with advertising options is investigated in a two-period horizon in which the market share in the second period...

متن کامل

Mathematical Programming Models for Solving Unequal-Sized Facilities Layout Problems - a Generic Search Method

 This paper present unequal-sized facilities layout solutions generated by a genetic search program named LADEGA (Layout Design using a Genetic Algorithm). The generalized quadratic assignment problem requiring pre-determined distance and material flow matrices as the input data and the continuous plane model employing a dynamic distance measure and a material flow matrix are discussed. Computa...

متن کامل

A Bi-Objective Airport Gate Scheduling with Controllable Processing Times Using Harmony Search and NSGA-II Algorithms

Optimizing gate scheduling at airports is an old, but also a broad problem. The main purpose of this problem is to find an assignment for the flights arriving at and departing from an airport, while satisfying a set of constraints.A closer look at the literature in this research line shows thatin almost all studies airport gate processing time has been considered as a fix parameter. In this res...

متن کامل

Time-Dependence in Multi-Agent MDP Applied to Gate Assignment Problem

Many disturbances can impact gate assignments in daily operations of an airport. Gate Assignment Problem (GAP) is the main task of an airport to ensure smooth flight-to-Gate assignment managing all disturbances. Or, flights schedule often undergoes some unplanned disruptions, such as weather conditions, gate availability or simply a delay that usually arises. A good plan to GAP should manage as...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010