Multicyclic hoist scheduling with constant processing times
نویسندگان
چکیده
This paper proposes an exact algorithm for the multicyclic schedules of hoist moves in a printed circuit board (PCB) electroplating facility, where exactly ( 1) parts enter and parts leave the production line during each cycle, and the processing time at each production stage is a given constant. The multicyclic scheduling problem is transformed into enumeration of intervals for linear functions of decision variables. This enumeration is accomplished with a branch and bound procedure. At each node of the search tree, by solving a linear programming problem (LPP), either the corresponding partial solution is proved to be unable to lead to a feasible solution, or a lower bound is computed. Due to its particular structure, this LPP is equivalent to a cycle time evaluation problem in a bivalued graph which can be solved efficiently. The proposed algorithm is polynomial in the number of tanks for a fixed , but exponential if is arbitrary. Computational experience with both benchmark and randomly generated test instances is presented.
منابع مشابه
Single Hoist Scheduling in No-Wait Flexible Flow Shop System
This paper studies the single hoist scheduling problem in no-wait flexible flow shop system with constant process times. The objective is to minimize the make span in the given job tasks. Different jobs have different process routes and process times. When a job starts, workstation must be free to process the job, and as soon as it is finished, the hoist must be free to move it to the next work...
متن کاملCoupling Hoist Scheduling and Production Line Arrangement for Productivity Maximization
Hoist scheduling is an important element for productivity maximization in multi-stage material handling processes, especially in electroplating system. However, the productivity of a multi-stage process not only depends on the hoist schedule, but also substantially relies on the production line arrangement, i.e., the design for spatial allocations of various processing units. In this paper, an ...
متن کاملSingle hoist cyclic scheduling with multiple tanks: a material handling solution
A hoist controlled by a computer is widely used for moving electroplates which is chemically treated in a sequence of tanks. The hoist scheduling directly a.ects the throughput of a production system. The objective of the hoist scheduling problem is to schedule the moves to maximize the throughput. This paper investigates the hoist scheduling problem, a speci2c material handling issue, in a man...
متن کاملA genetic algorithm approach for a single hoist scheduling problem with time windows constraints
This study considers a cyclic scheduling of hoist movements in electroplating industry. Several jobs have to flow through a production line according to an ordered bath sequence. They firstly enter the line at a loading buffer. Then they will be soaked sequentially in a series of tanks containing specific chemical baths. Finally, they will leave the line at the unloading buffer. The processing ...
متن کاملزمانبندی گروهی با در نظر گرفتن اثر یادگیری در سیستم تولید سلولی
The group scheduling problem in the cellular manufacturing system is comprised of two levels of scheduling. At the first level, the sequence of parts in each part-family is determined, and then at the second level the sequence of part-families is determined. In this paper, the flow shop group scheduling is investigated in order to minimize the makespan. In traditional group scheduling problems,...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- IEEE Trans. Robotics and Automation
دوره 18 شماره
صفحات -
تاریخ انتشار 2002