Value of Systems Engineering – SECOE Research Project Progress Report

نویسندگان

  • Eric Honour
  • Brian Mar
چکیده

This paper is a progress report on the results of a SECOE research project to collect and analyze data that describes project cost, schedule, and quality with systems engineering cost and quality. The original hypotheses to be tested are that (a) at low levels, increasing systems engineering effort results in better project quality, and (b) there is an optimum above which further increases are detrimental. The collection of data is much more difficult than anticipated. The preliminary results are presented in an attempt to encourage more individuals to submit data. Analysis of the preliminary data (25 project submissions) supports the hypotheses. The data suggests that dimensionless ratios of actual to planned cost and actual to planned schedule correlate with an independent variable defined as an index of systems engineering effort (product of systems engineering cost and systems engineering quality divided by total project cost).

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Project resource investment problem under progress payment model

As a general branch of project scheduling problems, resource investment problem (RIP) considers resource availabilities as decision variables to determine a level of employed resources minimizing the costs of the project. In addition to costs (cash outflows), researchers in the later extensions of the RIP took payments (cash inflows) received from clients into account and used the net present v...

متن کامل

A Systems Dynamics Model for Project Management systems of Project-Based Organization

It is obvious that the success of a project-based organization is dependent on its projects. A variety of tools such as the project excellence model, project management maturity models, the earned value method, have been developed in this regard, but there are still delays in projects because the projects have dynamic nature with non-linear relationships and feedback processes during the projec...

متن کامل

Performance Appraisal of Research and Development Projects Value-Chain for Complex Products and Systems: The Fuzzy Three-Stage DEA Approach

The purpose of the current research is to provide a performance appraisal system capable of considering the value chain network structure of research and development (R&D) projects for Complex products and systems (CoPS) under uncertainty of data. Therefore, in order to achieve this goal, a network data envelopment analysis (NDEA) approach and the possibilistic programming to provide a new fuzz...

متن کامل

Self-Starting Control Chart and Post Signal Diagnostics for Monitoring Project Earned Value Management Indices

Earned value management (EVM) is a well-known approach in a project control system which uses some indices to track schedule and cost performance of a project. In this paper, a new statistical framework based on self-starting monitoring and change point estimation is proposed to monitor correlated EVM indices which are usually auto-correlated over time and non-normally distributed. Also, a new ...

متن کامل

Assessment of Improvement of Preventive Maintenance Systems Related to the Civil Projects Using Concepts of Value Engineering (RESEARCH NOTE)

The purpose of this paper is using the concepts of value engineering (VE) in evaluating the improvement caused by preventive maintenance (PM) systems in construction project. A real case is used to show how we can implement the proposed method. VE is the systematic application of recognized techniques by multi-disciplined teams that identifies the function of a product or service, establishes a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2002